CENELEC
International Standards and Conformity Assessment
for all electrical, electronic and related technologies
CLC/TC 57 |
Power systems management and associated information exchange |

The Working documents of the technical bodies (with the exception of the voting results) are available on the Collaboration Tool.
Click here to access the Collaboration tool.
Click here to access the Collaboration tool.
|
Reference,Title
|
Downloads
|
Circulation date
|
Closing date
|
Voting / Comments
|
IEC parallel vote
|
|---|---|---|---|---|---|
|
FprEN 60870-5-6:2008 (pr=22066) Telecontrol equipment and systems - Part 5-6: Guidelines for conformance testing for the EN 60870-5 companion standards |
2009-03-30 | Procedure Result | No | ||
|
prEN 60870-5-104:2006 (pr=16512) Telecontrol equipment and systems - Part 5-104: Transmission protocols - Network access for IEC 60870-5-101 using standard transport profiles |
2006-05-03 | Procedure Result | Yes | ||
|
FprEN 61850-3:2012 (pr=24217) Communication networks and systems for power utility automation - Part 3: General requirements |
Procedure Result | Yes | |||
|
FprEN 61850-4:2009 (pr=22715) Communication networks and systems for power utility automation - Part 4: System and project management |
Procedure Result | Yes | |||
|
FprEN 61850-4:2011 (pr=22715) Communication networks and systems for power utility automation - Part 4: System and project management |
Procedure Result | Yes | |||
|
FprEN 61850-5:2012 (pr=23426) Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
Procedure Result | Yes | |||
|
FprEN 61850-5:2011 (pr=23426) Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
Procedure Result | Yes | |||
|
FprEN 61850-6:2009 (pr=21740) Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
2009-11-10 | Procedure Result | Yes | ||
|
FprEN 61850-6:2008 (pr=21740) Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
2008-07-14 | Procedure Result | Yes | ||
|
FprEN 61850-7-1:2008 (pr=21866) Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
2008-10-13 | Procedure Result | Yes | ||
|
FprEN 61850-7-1:2011 (pr=21866) Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
Procedure Result | Yes | |||
|
FprEN 61850-7-2:2008 (pr=21881) Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
2008-10-28 | Procedure Result | Yes | ||
|
FprEN 61850-7-2:2010 (pr=21881) Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
Procedure Result | Yes | |||
|
FprEN 61850-7-3:2008 (pr=21897) Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
2008-11-10 | Procedure Result | Yes | ||
|
FprEN 61850-7-3:2010 (pr=21897) Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
Procedure Result | Yes | |||
|
FprEN 61850-7-4:2009 (pr=21865) Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
2010-02-08 | Procedure Result | Yes | ||
|
FprEN 61850-7-4:2008 (pr=21865) Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
2008-10-13 | Procedure Result | Yes | ||
|
prEN 61850-7-410:2006 (pr=20655) Communication networks and systems for power utility automation - Part 7-410: Hydroelectric power plants - Communication for monitoring and control |
2006-10-02 | Procedure Result | Yes | ||
|
prEN 61850-7-410:2007 (pr=20655) Communication networks and systems for power utility automation - Part 7-410: Hydroelectric power plants - Communication for monitoring and control |
2007-07-25 | Procedure Result | Yes | ||
|
FprEN 61850-7-410:2010 (pr=23149) Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control |
Procedure Result | Yes | |||
|
FprEN 61850-7-410:2012 (pr=23149) Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control |
Procedure Result | Yes | |||
|
FprEN 61850-7-420:2008 (pr=20656) Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
2009-01-13 | Procedure Result | Yes | ||
|
prEN 61850-7-420:2006 (pr=20656) Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
2006-10-02 | Procedure Result | Yes | ||
|
FprEN 61850-8-1:2009 (pr=22348) Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
Procedure Result | Yes | |||
|
FprEN 61850-8-1:2011 (pr=22348) Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
Procedure Result | Yes | |||
|
FprEN 61850-9-2:2011 (pr=22373) Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
Procedure Result | Yes | |||
|
FprEN 61850-9-2:2009 (pr=22373) Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
Procedure Result | Yes | |||
|
FprEN 61850-10:2011 (pr=23673) Communication networks and systems for power utility automation - Part 10: Conformance testing |
Procedure Result | Yes | |||
|
FprEN 61850-10:2012 (pr=23673) Communication networks and systems for power utility automation - Part 10: Conformance testing |
Procedure Result | Yes | |||
|
CLC/FprTS 61850-80-1:2009 (pr=22223) Communication networks and systems for power utility automation - Part 80-1: Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 |
2009-11-30 | Procedure Result | No | ||
|
FprEN 61968-1:2012 (pr=23352) Application integration at electric utilities - System interfaces for distribution management - Part 1: Interface architecture and general recommendations |
Procedure Result | Yes | |||
|
FprEN 61968-1:2011 (pr=23352) Application integration at electric utilities - System interfaces for distribution management - Part 1: Interface architecture and general recommendations |
Procedure Result | Yes | |||
|
prEN 61968-4:2007 (pr=20483) Application integration at electric utilities - System interfaces for distribution management - Part 4: Interfaces for records and asset management |
2007-06-18 | Procedure Result | Yes | ||
|
prEN 61968-4:2006 (pr=20483) Application integration at electric utilities - System interfaces for distribution management - Part 4: Interfaces for records and asset management |
2006-06-20 | Procedure Result | Yes | ||
|
FprEN 61968-9:2008 (pr=21890) Application integration at electric utilities - System interfaces for distribution management - Part 9: Interface for meter reading and control |
2008-11-03 | Procedure Result | Yes | ||
|
FprEN 61968-9:2009 (pr=21890) Application integration at electric utilities - System interfaces for distribution management - Part 9: Interface for meter reading and control |
2009-08-17 | Procedure Result | Yes | ||
|
FprEN 61968-9:2012 (pr=24185) Application integration at electric utilities - System interfaces for distribution management - Part 9: Interfaces for meter reading and control |
Procedure Result | Yes | |||
|
FprEN 61968-11:2010 (pr=22450) Application integration at electric utilities - System interfaces for distribution management - Part 11: Common information model (CIM) extensions for distribution |
Procedure Result | Yes | |||
|
FprEN 61968-11:2009 (pr=22450) Application integration at electric utilities - System interfaces for distribution management - Part 11: Common information model (CIM) extensions for distribution |
2009-10-19 | Procedure Result | Yes | ||
|
FprEN 61968-11:2012 (pr=23674) Application integration at electric utilities - System interfaces for distribution management - Part 11: Common information model (CIM) extensions for distribution |
Procedure Result | Yes | |||
|
FprEN 61968-11:2011 (pr=23674) Application integration at electric utilities - System interfaces for distribution management - Part 11: Common information model (CIM) extensions for distribution |
Procedure Result | Yes | |||
|
FprEN 61968-13:2008 (pr=20799) Application integration at electric utilities - System interfaces for distribution management - Part 13: CIM RDF Model exchange format for distribution |
2008-06-10 | Procedure Result | Yes | ||
|
prEN 61968-13:2006 (pr=20799) Application integration at electric utilities - System interfaces for distribution management - Part 13: CIM RDF Model exchange format for distribution |
2007-01-02 | Procedure Result | Yes | ||
|
FprEN 61968-100:2012 (pr=24186) Application integration at electric utilities - System interfaces for distribution management - Part 100: Implementation profiles |
Procedure Result | Yes | |||
|
FprEN 61970-301:2009 (pr=22683) Energy management system application program interface (EMS-API) - Part 301: Common information model (CIM) base |
Procedure Result | Yes | |||
|
FprEN 61970-301:2011 (pr=22683) Energy management system application program interface (EMS-API) - Part 301: Common information model (CIM) base |
Procedure Result | Yes | |||
|
FprEN 61970-301:2013 (pr=23904) Energy Management System Application Program Interface (EMS-API) - Part 301: Common Information Model (CIM) Base |
Procedure Result | Yes | |||
|
FprEN 61970-301:2011 (pr=23904) Energy Management System Application Program Interface (EMS-API) - Part 301: Common Information Model (CIM) Base |
Procedure Result | Yes | |||
|
prEN 61970-402:2006 (pr=20732) Energy management system application program interface (EMS-API) - Part 402: Common services |
2006-11-28 | Procedure Result | Yes | ||
|
FprEN 61970-402:2008 (pr=20732) Energy management system application program interface (EMS-API) - Part 402: Common services |
2008-05-27 | Procedure Result | Yes | ||
|
prEN 61970-403:2006 (pr=20733) Energy management system application program interface (EMS-API) - Part 403: Generic data access |
2006-11-28 | Procedure Result | Yes | ||
|
FprEN 61970-403:2008 (pr=20733) Energy management system application program interface (EMS-API) - Part 403: Generic data access |
2008-05-27 | Procedure Result | Yes | ||
|
prEN 61970-404:2006 (pr=20734) Energy management system application program interface (EMS-API) - Part 404: High Speed Data Access (HSDA) |
2006-11-28 | Procedure Result | Yes | ||
|
prEN 61970-404:2007 (pr=20734) Energy management system application program interface (EMS-API) - Part 404: High Speed Data Access (HSDA) |
2007-07-25 | Procedure Result | Yes | ||
|
prEN 61970-405:2006 (pr=20735) Energy management system application program interface (EMS-API) - Part 405: Generic Eventing and Subscription (GES) |
2006-11-28 | Procedure Result | Yes | ||
|
prEN 61970-405:2007 (pr=20735) Energy management system application program interface (EMS-API) - Part 405: Generic Eventing and Subscription (GES) |
2007-07-25 | Procedure Result | Yes | ||
|
prEN 61970-407:2006 (pr=20736) Energy management system application program interface (EMS-API) - Part 407: Time Series Data Access (TSDA) |
2006-11-28 | Procedure Result | Yes | ||
|
prEN 61970-407:2007 (pr=20736) Energy management system application program interface (EMS-API) - Part 407: Time Series Data Access (TSDA) |
2007-07-25 | Procedure Result | Yes | ||
|
FprEN 61970-452:2012 (pr=24361) Energy Management System Application Program Interface (EMS-API) - Part 452: CIM static transmission network model profiles |
Procedure Result | Yes | |||
|
prEN 61970-453:2007 (pr=21178) Energy management system application program interface (EMS-API) - Part 453: CIM based graphics exchange |
2008-04-04 | Procedure Result | Yes | ||
|
FprEN 61970-453:2012 (pr=24353) Energy Management System Application Program Interface (EMS-API) - Part 453: Diagram Layout Profile |
Procedure Result | Yes | |||
|
FprEN 61970-456:2013 (pr=23261) Energy management system application program interface (EMS-API) - Part 456: Solved power system state profiles |
Procedure Result | Yes | |||
|
FprEN 61970-456:2010 (pr=23261) Energy management system application program interface (EMS-API) - Part 456: Solved power system state profiles |
Procedure Result | Yes | |||
|
prEN 61970-501:2005 (pr=15991) Energy management system application program interface (EMS-API) - Part 501: Common Information Model Resource Description Framework (CIM RDF) schema |
2006-02-20 | Procedure Result | Yes | ||
|
FprEN 61970-552:2012 (pr=24300) Energy Management System Application Program Interface (EMS-API) - Part 552: CIM XML Model Exchange Format |
Procedure Result | Yes | |||
|
FprEN 62325-301:2012 (pr=24172) Framework for energy market communications - Part 301: Common Information Model (CIM) extensions for markets |
Procedure Result | Yes | |||
|
FprEN 62325-351:2012 (pr=24230) Framework for energy market communications - Part 351: CIM European market model exchange profile |
Procedure Result | Yes | |||
|
FprEN 62325-450:2011 (pr=23858) Framework for energy market communications - Part 450: Profile and context modelling rules |
Procedure Result | Yes | |||
|
FprEN 62325-450:2013 (pr=23858) Framework for energy market communications - Part 450: Profile and context modelling rules |
Procedure Result | Yes | |||
|
FprEN 62325-451-1:2012 (pr=24407) Framework for energy market communications - Part 451-1: Acknowledgement business process and contextual model for CIM European market |
Procedure Result | Yes | |||
|
FprEN 62361:2010 (pr=22878) Harmonization of quality codes across TC 57 - Common list of quality codes |
Procedure Result | Yes | |||
|
FprEN 62361-100:2011 (pr=23861) Harmonization of quality codes across TC 57 - Part 100: Naming and design rules for CIM profiles to XML schema mapping |
Procedure Result | Yes | |||
|
FprEN 62488-1:2012 (pr=23442) Power line communication systems for power utility applications - Part 1: Planning of analogue and digital power line carrier systems operating over EHV/HV/MV electricity grids |
Procedure Result | Yes | |||
|
FprEN 62488-1:2011 (pr=23442) Power line communication systems for power utility applications - Part 1: Planning of analogue and digital power line carrier systems operating over EHV/HV/MV electricity grids |
Procedure Result | Yes |
Reference,Title | Downloads |
|---|---|
Definitive Text - EN 60870-5-6:2009 Telecontrol equipment and systems - Part 5-6: Guidelines for conformance testing for the EN 60870-5 companion standards | |
Definitive Text - EN 60870-5-6:2009 Telecontrol equipment and systems - Part 5-6: Guidelines for conformance testing for the EN 60870-5 companion standards | |
Definitive Text - HD 546.3 S1:1991 Telecontrol equipment and systems - Part 3: Interfaces (electrical characteristics) | |
Definitive Text - HD 543.2 S1:1995 Performance and testing of teleprotection equipment of power systems - Part 2: Analogue comparison systems | |
Definitive Text - HD 546.4 S1:1992 Telecontrol equipment and systems - Part 4: Performance requirements | |
Definitive Text - EN 60495:1994 Single sideband power-line carrier terminals | |
Definitive Text - EN 60834-1:1999 Teleprotection equipment of power systems - Performance and testing - Part 1: Command systems | |
Definitive Text - EN 60870-2-1:1996 Telecontrol equipment and systems - Part 2: Operating conditions - Section 1: Power supply and electromagnetic compatibility | |
Definitive Text - EN 60870-2-2:1996 Telecontrol equipment and systems - Part 2: Operating conditions - Section 2: Environmental conditions (climatic, mechanical and other non-electrical influences) | |
Definitive Text - EN 60870-5-1:1993 Telecontrol equipment and systems - Part 5: Transmission protocols - Section 1: Transmission frame formats | |
Definitive Text - EN 60870-5-2:1993 Telecontrol equipment and systems - Part 5: Transmission protocols - Section 2: Link transmission procedures | |
Definitive Text - EN 60870-5-3:1992 Telecontrol equipment and systems - Part 5: Transmission protocols - Section 3: General structure of application data | |
Definitive Text - EN 60870-5-4:1993 Telecontrol equipment and systems - Part 5: Transmission protocols - Section 4: Definition and coding of application information elements | |
Definitive Text - EN 60870-5-5:1995 Telecontrol equipment and systems - Part 5: Transmission protocols - Section 5: Basic application functions | |
Definitive Text - EN 60870-5-101:2003 Telecontrol equipment and systems - Part 5-101: Transmission protocols - Companion standard for basic telecontrol tasks | |
Definitive Text - EN 60870-5-102:1996 Telecontrol equipment and systems - Part 5: Transmission protocols - Section 102: Companion standard for the transmission of integrated totals in electric power systems | |
Definitive Text - EN 60870-5-103:1998 Telecontrol equipment and systems - Part 5-103: Transmission protocols - Companion standard for the informative interface of protection equipment | |
Definitive Text - EN 60870-5-104:2006 Telecontrol equipment and systems - Part 5-104: Transmission protocols - Network access for IEC 60870-5-101 using standard transport profiles | |
Definitive Text - EN 60870-5-104:2006 Telecontrol equipment and systems - Part 5-104: Transmission protocols - Network access for IEC 60870-5-101 using standard transport profiles | |
Definitive Text - EN 60870-5-104:2006 Telecontrol equipment and systems - Part 5-104: Transmission protocols - Network access for IEC 60870-5-101 using standard transport profiles | |
Definitive Text - EN 60870-6-2:1995 Telecontrol equipment and systems - Part 6: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - Section 2: Use of basic standards (OSI layers 1-4) | |
Definitive Text - EN 60870-6-501:1996 Telecontrol equipment and systems - Part 6: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - Section 501: TASE.1 Service definitions | |
Definitive Text - EN 60870-6-502:1996 Telecontrol equipment and systems - Part 6: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - Section 502: TASE.1 Protocol definitions | |
Definitive Text - EN 60870-6-503:2002 Telecontrol equipment and systems - Part 6-503: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - TASE.2 Services and protocol | |
Definitive Text - EN 60870-6-601:1995 Telecontrol equipment and systems - Part 6: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - Section 601: Functional Profile for providing the Connection-Oriented Transport Service in End System connected via permanent access to a Packet Switched Data Network | |
Definitive Text - EN 60870-6-701:1998 Telecontrol equipment and systems - Part 6-701: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - Functional profile for providing the TASE.1 application service in end systems | |
Definitive Text - EN 60870-6-702:1998 Telecontrol equipment and systems - Part 6-702: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - Functional profile for providing the TASE.2 application service in end systems | |
Definitive Text - EN 60870-6-802:2002 Telecontrol equipment and systems - Part 6-802: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - TASE.2 Object models | |
Definitive Text - EN 60870-6-802:2002/A1:2005 Telecontrol equipment and systems - Part 6-802: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - TASE.2 Object models | |
Definitive Text - EN 60870-6-802:2002/A1:2005 Telecontrol equipment and systems - Part 6-802: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - TASE.2 Object models | |
Definitive Text - EN 61334-3-21:1996 Distribution automation using distribution line carrier systems - Part 3: Mains signaling requirements - Section 21: MV phase-to-phase isolated capacitive coupling device | |
Definitive Text - EN 61334-3-22:2001 Distribution automation using distribution line carrier systems - Part 3-22: Mains signaling requirements - MV phase-to-earth and screen-to-earth intrusive coupling devices | |
Definitive Text - EN 61334-4-1:1996 Distribution automation using distribution line carrier systems - Part 4: Data communication protocols - Section 1: Reference model of the communication system | |
Definitive Text - EN 61334-4-32:1996 Distribution automation using distribution line carrier systems - Part 4: Data communication protocols - Section 32: Data link layer - Logical link control (LLC) | |
Definitive Text - EN 61334-4-33:1998 Distribution automation using distribution line carrier systems - Part 4-33: Data communication protocols - Data link layer - Connection oriented protocol | |
Definitive Text - EN 61334-4-41:1996 Distribution automation using distribution line carrier systems - Part 4: Data communication protocols - Section 41: Application protocols - Distribution line message specification | |
Definitive Text - EN 61334-4-42:1996 Distribution automation using distribution line carrier systems - Part 4: Data communication protocols - Section 42: Application protocols - Application layer | |
Definitive Text - EN 61334-4-61:1998 Distribution automation using distribution line carrier systems - Part 4-61: Data communication protocols - Network layer - Connectionless protocol | |
Definitive Text - EN 61334-4-511:2000 Distribution automation using distribution line carrier systems - Part 4-511: Data communication protocols - Systems management - CIASE protocol | |
Definitive Text - EN 61334-4-512:2002 Distribution automation using distribution line carrier systems - Part 4-512: Data communication protocols - System management using profile 61334-5-1 - Management Information Base (MIB) | |
Definitive Text - EN 61334-5-1:2001 Distribution automation using distribution line carrier systems - Part 5-1: Lower layer profiles - The spread frequency shift keying (S-FSK) profile | |
Definitive Text - EN 61334-6:2000 Distribution automation using distribution line carrier systems - Part 6: A-XDR encoding rule | |
Definitive Text - EN 61850-3:2002 Communication networks and systems in substations - Part 3: General requirements | |
Definitive Text - EN 61850-6:2004 Communication networks and systems in substations - Part 6: Configuration description language for communication in electrical substations related to IEDs | |
Definitive Text - EN 61850-6:2010 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs | |
Definitive Text - EN 61850-6:2010 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs | |
Definitive Text - EN 61850-7-4:2003 Communication networks and systems in substations - Part 7-4: Basic communication structure for substation and feeder equipment - Compatible logical node classes and data classes | |
Definitive Text - EN 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes | |
Definitive Text - EN 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes | |
Definitive Text - EN 61850-7-420:2009 Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes | |
Definitive Text - EN 61850-7-420:2009 Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes | |
Definitive Text - EN 61850-7-420:2009 Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes | |
Definitive Text - EN 61850-9-1:2003 Communication networks and systems in substations - Part 9-1: Specific Communication Service Mapping (SCSM) - Sampled values over serial unidirectional multidrop point to point link | |
Definitive Text - EN 61850-10:2005 Communication networks and systems in substations - Part 10: Conformance testing | |
Definitive Text - EN 61850-10:2005 Communication networks and systems in substations - Part 10: Conformance testing | |
Definitive Text - CLC/TS 61850-80-1:2010 Communication networks and systems for power utility automation - Part 80-1: Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 | |
Definitive Text - EN 61968-3:2004 Application integration at electric utilities - System interfaces for distribution management - Part 3: Interface for network operations | |
Definitive Text - EN 61970-1:2006 Energy management system application program interface (EMS-API) - Part 1: Guidelines and general requirements | |
Definitive Text - EN 61970-1:2006 Energy management system application program interface (EMS-API) - Part 1: Guidelines and general requirements | |
Definitive Text - EN 61970-1:2006 Energy management system application program interface (EMS-API) - Part 1: Guidelines and general requirements | |
Definitive Text - CLC/TS 61970-2:2005 Energy management system application program interface (EMS-API) - Part 2: Glossary | |
Definitive Text - CLC/TS 61970-2:2005 Energy management system application program interface (EMS-API) - Part 2: Glossary | |
Definitive Text - EN 61970-402:2008 Energy management system application program interface (EMS-API) - Part 402: Common services | |
Definitive Text - EN 61970-402:2008 Energy management system application program interface (EMS-API) - Part 402: Common services | |
Definitive Text - EN 61970-403:2008 Energy management system application program interface (EMS-API) - Part 403: Generic data access | |
Definitive Text - EN 61970-403:2008 Energy management system application program interface (EMS-API) - Part 403: Generic data access | |
Definitive Text - EN 61970-404:2007 Energy management system application program interface (EMS-API) - Part 404: High Speed Data Access (HSDA) | |
Definitive Text - EN 61970-404:2007 Energy management system application program interface (EMS-API) - Part 404: High Speed Data Access (HSDA) | |
Definitive Text - EN 61970-405:2007 Energy management system application program interface (EMS-API) - Part 405: Generic Eventing and Subscription (GES) | |
Definitive Text - EN 61970-405:2007 Energy management system application program interface (EMS-API) - Part 405: Generic Eventing and Subscription (GES) | |
Definitive Text - EN 61970-407:2007 Energy management system application program interface (EMS-API) - Part 407: Time Series Data Access (TSDA) | |
Definitive Text - EN 61970-407:2007 Energy management system application program interface (EMS-API) - Part 407: Time Series Data Access (TSDA) | |
Definitive Text - EN 61970-453:2008 Energy management system application program interface (EMS-API) - Part 453: CIM based graphics exchange | |
Definitive Text - EN 61970-453:2008 Energy management system application program interface (EMS-API) - Part 453: CIM based graphics exchange | |
Definitive Text - EN 61968-4:2007 Application integration at electric utilities - System interfaces for distribution management - Part 4: Interfaces for records and asset management | |
Definitive Text - EN 61968-4:2007 Application integration at electric utilities - System interfaces for distribution management - Part 4: Interfaces for records and asset management | |
Definitive Text - EN 61968-9:2009 Application integration at electric utilities - System interfaces for distribution management - Part 9: Interface for meter reading and control | |
Definitive Text - EN 61968-9:2009 Application integration at electric utilities - System interfaces for distribution management - Part 9: Interface for meter reading and control | |
Definitive Text - EN 61968-11:2010 Application integration at electric utilities - System interfaces for distribution management - Part 11: Common information model (CIM) extensions for distribution | |
Definitive Text - EN 61968-11:2010 Application integration at electric utilities - System interfaces for distribution management - Part 11: Common information model (CIM) extensions for distribution | |
Definitive Text - EN 61968-11:2010 Application integration at electric utilities - System interfaces for distribution management - Part 11: Common information model (CIM) extensions for distribution | |
Definitive Text - EN 61968-13:2008 Application integration at electric utilities - System interfaces for distribution management - Part 13: CIM RDF Model exchange format for distribution | |
Definitive Text - EN 61968-13:2008 Application integration at electric utilities - System interfaces for distribution management - Part 13: CIM RDF Model exchange format for distribution | |
Definitive Text - EN 61968-13:2008 Application integration at electric utilities - System interfaces for distribution management - Part 13: CIM RDF Model exchange format for distribution | |
Definitive Text - EN 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 | |
Definitive Text - EN 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 | |
Definitive Text - EN 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 | |
Definitive Text - EN 61850-8-1:2004 Communication networks and systems in substations - Part 8-1: Specific Communication Service Mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 | |
Definitive Text - EN 61850-7-3:2011 Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes | |
Definitive Text - EN 61850-7-3:2011 Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes | |
Definitive Text - EN 61850-7-3:2011 Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes | |
Definitive Text - EN 61850-7-3:2003 Communication networks and systems in substations - Part 7-3: Basic communication structure for substation and feeder equipment - Common data classes | |
Definitive Text - EN 61850-7-1:2003 Communication networks and systems in substations - Part 7-1: Basic communication structure for substation and feeder equipment - Principles and models | |
Definitive Text - EN 61850-7-2:2003 Communication networks and systems in substations - Part 7-2: Basic communication structure for substation and feeder equipment - Abstract communication service interface (ACSI) | |
Definitive Text - EN 61970-301:2011 Energy management system application program interface (EMS-API) - Part 301: Common information model (CIM) base | |
Definitive Text - EN 61970-301:2011 Energy management system application program interface (EMS-API) - Part 301: Common information model (CIM) base | |
Definitive Text - EN 61970-301:2011 Energy management system application program interface (EMS-API) - Part 301: Common information model (CIM) base | |
Definitive Text - EN 61850-4:2002 Communication networks and systems in substations - Part 4: System and project management | |
Definitive Text - EN 61970-301:2004 Energy management system application program interface (EMS-API) - Part 301: Common Information Model (CIM) base | |
Definitive Text - EN 61970-301:2004 Energy management system application program interface (EMS-API) - Part 301: Common Information Model (CIM) base | |
Definitive Text - EN 61970-301:2004 Energy management system application program interface (EMS-API) - Part 301: Common Information Model (CIM) base | |
Definitive Text - EN 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 | |
Definitive Text - EN 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 | |
Definitive Text - EN 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 | |
Definitive Text - EN 61850-9-2:2004 Communication networks and systems in substations - Part 9-2: Specific Communication Service Mapping (SCSM) - Sampled values over ISO/IEC 8802-3 | |
Definitive Text - EN 61850-4:2011 Communication networks and systems for power utility automation - Part 4: System and project management | |
Definitive Text - EN 61850-4:2011 Communication networks and systems for power utility automation - Part 4: System and project management | |
Definitive Text - EN 61850-4:2011 Communication networks and systems for power utility automation - Part 4: System and project management | |
Definitive Text - EN 61850-7-1:2011 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models | |
Definitive Text - EN 61970-501:2006 Energy management system application program interface (EMS-API) - Part 501: Common Information Model Resource Description Framework (CIM RDF) schema | |
Definitive Text - EN 61970-501:2006 Energy management system application program interface (EMS-API) - Part 501: Common Information Model Resource Description Framework (CIM RDF) schema | |
Definitive Text - EN 61850-7-1:2011 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models | |
Definitive Text - EN 61850-7-1:2011 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models | |
Definitive Text - EN 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) | |
Definitive Text - EN 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) | |
Definitive Text - EN 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) | |
Definitive Text - EN 61850-7-410:2007 Communication networks and systems for power utility automation - Part 7-410: Hydroelectric power plants - Communication for monitoring and control | |
Definitive Text - EN 61850-7-410:2007 Communication networks and systems for power utility automation - Part 7-410: Hydroelectric power plants - Communication for monitoring and control | |
Definitive Text - EN 61850-7-410:2007 Communication networks and systems for power utility automation - Part 7-410: Hydroelectric power plants - Communication for monitoring and control | |
Definitive Text - EN 62488-1:2013 Power line communication systems for power utility applications - Part 1: Planning of analogue and digital power line carrier systems operating over EHV/HV/MV electricity grids | |
Definitive Text - EN 62488-1:2013 Power line communication systems for power utility applications - Part 1: Planning of analogue and digital power line carrier systems operating over EHV/HV/MV electricity grids | |
Definitive Text - EN 62488-1:2013 Power line communication systems for power utility applications - Part 1: Planning of analogue and digital power line carrier systems operating over EHV/HV/MV electricity grids | |
Definitive Text - EN 61968-1:2004 Application integration at electric utilities - System interfaces for distribution management - Part 1: Interface architecture and general requirements | |
Definitive Text - EN 61850-7-410:2013 Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control | |
Definitive Text - EN 61850-7-410:2013 Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control | |
Definitive Text - EN 61850-5:2003 Communication networks and systems in substations - Part 5: Communication requirements for functions and device models | |
Definitive Text - EN 61850-5:2013 Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models | |
Definitive Text - EN 61850-5:2013 Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models | |
Definitive Text - EN 61850-5:2013 Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models | |
Definitive Text - EN 61968-1:2013 Application integration at electric utilities - System interfaces for distribution management - Part 1: Interface architecture and general recommendations | |
Definitive Text - EN 61968-1:2013 Application integration at electric utilities - System interfaces for distribution management - Part 1: Interface architecture and general recommendations | |
Definitive Text - EN 61968-1:2013 Application integration at electric utilities - System interfaces for distribution management - Part 1: Interface architecture and general recommendations |
