CENELEC

Project
| Reference | HD 384.4.473 S1:1980 |
|---|---|
| Title | Electrical installations of buildings - Part 4: Protection for safety - Chapter 47: Application of protective measures for safety - Section 473: Measures of protection against overcurrent |
| Project Number | 2242 |
| Abstract/Scope | Specifies where overload and short-circuit protective devices have to be placed in the run of the conductor. States particular requirements for protection of phase and neutral conductors according to TN, TT and IT systems. Note: -Requirements do not take account of external influences. For application of protective measures in relation to conditions of external influences, see IEC 60364-4-482. |
| Status |
Withdrawn
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 1980-05-14 |
| Current Stage code deadline | 1981-10-01 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 64 |
|---|---|
| Reference Document | IEC 60364-4-473:1977 (MOD) |
| ICS | |
| Keywords | Building; Electrical installation; Overcurrent; Protection |
| Note | Corrigendum to HD issued December 2005 * Superseded by HD 60364-4-43:2010 (see email from Secretary dated 2012-11-06 in dataservice) |
| A-Deviation(s) | DK, IT |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
|
Stage
|
Date
|
Deadline Date
|
Documents
|
|---|---|---|---|
| 6060 | 1980-05-14 | 1981-10-01 |
Implementation Dates
| date of Ratification (DOR) (1) | 1978-09-29 |
|---|---|
| date of Availability (DAV) (2) | 1980-05-14 |
| date of Announcement (DOA) (3) | dor + 6 months |
| date of Publication (DOP) (4) | 1981-10-01 |
| date of Withdrawal (DOW) (5) | dor + 36 months |
Relations
| Supersedes | HD_NO 25:200X |
|---|---|
| Superseded by | HD 60364-4-43:2010 |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
