CENELEC

Project
| Reference | EN 60079-26:2007 |
|---|---|
| Title | Explosive atmospheres - Part 26: Equipment with equipment protection level (EPL) Ga |
| Project Number | 16764 |
| Abstract/Scope | This part of IEC 60079 specifies the particular requirements for construction, test and marking for electrical equipment that provides equipment protection level (EPL) Ga. This electrical equipment, within the operational parameters specified by the manufacturer, ensures a very high level of protection that includes rare faults related to the equipment or two faults occurring independently of each other. The contents of the corrigendum of March 2009 have been included in this copy. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2007-03-23 |
| Current Stage code deadline | 2007-10-01 |
| Deadline date for vote |
Legal
| Directive(s) | ATEX (94/9/EC) |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 31 |
|---|---|
| Reference Document | IEC 60079-26:2006 (EQV) |
| ICS | 29.260.20 - Electrical apparatus for explosive atmospheres |
| Keywords | Explosive atmosphere; Gas; Construction; Test; Marking |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2006-10-01 |
|---|---|
| date of Availability (DAV) (2) | 2007-03-23 |
| date of Announcement (DOA) (3) | 2007-01-01 |
| date of Publication (DOP) (4) | 2007-10-01 |
| date of Withdrawal (DOW) (5) | 2009-10-01 |
Relations
| Supersedes | EN 60079-26:2004 |
|---|---|
| Superseded by | |
| Normative reference (6) |
EN 60079-0:2006
EN 60079-1:2004 corr. March 2004 corr. April 2006 EN 60079-10:2003 EN 60079-11:2007 EN 60079-18:2004 corr. April 2006 EN 60695-11-10:1999 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
