CENELEC

Project
| Reference | EN 62055-31:2005 |
|---|---|
| Title | Electricity metering - Payment systems - Part 31: Particular requirements - Static payment meters for active energy (classes 1 and 2) |
| Project Number | 13665 |
| Abstract/Scope | applies to newly manufactured, static watt-hour payment meters of accuracy classes 1 and 2 for direct connection, for the measurement of alternating current electrical energy consumption of a frequency in the range 45 Hz to 65 Hz that include a load switch for the purpose of interruption or restoration of the electricity supply to the load in accordance with the current value of the available credit maintained in the payment meter. It does not apply to static watt-hour payment meters where the voltage across the connection terminals exceeds 600 V (line-to-line voltage for meters for polyphase systems). |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2005-12-07 |
| Current Stage code deadline | 2006-08-01 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 13 |
|---|---|
| Reference Document | IEC 62055-31:2005 (EQV) |
| ICS | 91.140.50 - Electricity supply systems |
| Keywords | Metering equipment; Payment system; Payment meter |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2005-11-01 |
|---|---|
| date of Availability (DAV) (2) | 2005-12-07 |
| date of Announcement (DOA) (3) | 2006-02-01 |
| date of Publication (DOP) (4) | 2006-08-01 |
| date of Withdrawal (DOW) (5) | 2008-11-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) | IEC 60050-300:2001 EN 61000-4-5:1995 EN 61008-1:2004 : prAA: A11:2007 A13:2012 A12:2009 EN 61358:1996 IEC/TR 62051:1999 EN 62052-11:2003 EN 62053-21:2003 EN 62054-21:2004 IEC 62055-21:2005 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
