CENELEC
CLC/TC 86A |
Optical fibres and optical fibre cables |

Project
| Reference | EN 60793-2-30:2013 |
|---|---|
| Title | Optical fibres - Part 2-30: Product specifications - Sectional specification for category A3 multimode fibres |
| Project Number | 23676 |
| Abstract/Scope | IEC 60793-2-30:2012(E) is applicable sub-categories A3a, A3b, A3c, A3d and A3e. Three types of requirements apply to these fibres: general requirements, as defined in IEC 60793-2; specific requirements common to the category A3 multimode fibres covered in this standard and which are given in Clause 3; particular requirements applicable to the individual sub-categories or specific applications (e.g. automotive or industrial applications), which are defined in the normative sub-category annexes. This third edition cancels and replaces the second edition, published in 2007. It constitutes a technical revision andincludes the following significant technical changes with respect to the previous edition: addition of a new sub-category A3e; changed unit for core-cladding concentricity error and proof stress level. Keyworks: A3 multimode fibres, sectional specification, sub-categories A3a, A3b, A3c, A3d and A3e |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2013-01-25 |
| Current Stage code deadline | 2013-08-29 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 86A |
|---|---|
| Reference Document | IEC 60793-2-30:2012 (EQV) |
| ICS | 33.180.10 - Fibres and cables |
| Keywords | Optic; Optical fibre; Multimode |
| Note | Supersedes EN 60793-2-30:2009 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2012-11-29 |
|---|---|
| date of Availability (DAV) (2) | 2013-01-25 |
| date of Announcement (DOA) (3) | 2013-02-28 |
| date of Publication (DOP) (4) | 2013-08-29 |
| date of Withdrawal (DOW) (5) | 2015-11-29 |
Relations
| Supersedes | EN 60793-2-30:2009 |
|---|---|
| Superseded by | |
| Normative reference (6) |
EN 60793-1-20:2002
EN 60793-1-21:2002 EN 60793-1-22:2002 EN 60793-1-30:2011 EN 60793-1-31:2010 EN 60793-1-40:2003 EN 60793-1-41:2010 EN 60793-1-46:2002 EN 60793-1-50:2002 EN 60793-1-51:2002 EN 60793-1-52:2002 EN 60793-2:2012 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
