International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Projet

Reference EN 61512-1:1999
Title Contrôle-commande des processus de fabrication par lots - Partie 1: Modèles et terminologie
Project Number 11792
Abstract/Scope Définit des modèles de référence s'appliquant au contrôle-commande de processus de fabrication par lots tel qu'il est utilisé dans les industries de processus ainsi qu'une terminologie permettant d'expliquer les relations entre ces modèles et ces termes. Ne s'applique pas à toutes les applications de contrôle-commande des processus de fabrication par lots.
Status
Published

Statut

Current Stage code 6060
Current Stage code date 1999-06-25
Current Stage code deadline 2000-08-01
Deadline date for vote  

Légal

Directive(s)  
Mandate(s)  
Order Voucher  

Détails

IEC Technical Body IEC/SC 65A
Reference Document IEC 61512-1:1997 (EQV)
ICS 01.040.25 - Manufacturing engineering (Vocabularies)
25.040.40 - Industrial process measurement and control
Keywords  
Note  
A-Deviation(s)  
Special National Condition(s)  

Environnement

Clause
Categories - Aspects
Cycle de vie du produit
Information

Histoire

Stage
Date
Deadline Date
Documents
6060 1999-06-25 2000-08-01 export to doc file  EN
6020 1999-06-01 1999-09-01  
5099 1999-05-01 1999-06-01  
5060 1999-03-25 1999-05-01  
5020 1998-11-20 1999-02-28  
1599 1998-03-10 1998-09-10  
1560 1998-01-30 1998-04-01  
1520 1997-10-14 1998-01-15  
1099 1997-09-30 1997-10-31  

Dates de mise en application

date of Ratification (DOR) (1) 1999-05-01
date of Availability (DAV) (2) 1999-06-25
date of Announcement (DOA) (3) 2000-02-01
date of Publication (DOP) (4) 2000-08-01
date of Withdrawal (DOW) (5) 2002-08-01

Rélations

Supersedes  
Superseded by  
Normative reference (6) IEC 60848:1988
IEC 60902:1987

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.