| Reference | EN 61850-7-410:2013 |
|---|---|
| Title | Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control |
| Project Number | 23149 |
| Abstract/Scope | IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows: - the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010; - the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated; - most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510. This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2013-01-18 |
| Current Stage code deadline | 2013-09-04 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | M/490 |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 57 |
|---|---|
| Reference Document | IEC 61850-7-410:2012 (EQV) |
| ICS | 33.200 - Telecontrol. Telemetering |
| Keywords | Communication; Power utility; Automation; Hydroelectric; Power plant |
| Note | Supersedes EN 61850-7-410:2007 * 2012-11-06: Publication processing allocated to cpalagi@cencenelec.eu |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2012-12-04 |
|---|---|
| date of Availability (DAV) (2) | 2013-01-18 |
| date of Announcement (DOA) (3) | 2013-03-04 |
| date of Publication (DOP) (4) | 2013-09-04 |
| date of Withdrawal (DOW) (5) | 2015-12-04 |
Relations
| Supersedes | EN 61850-7-410:2007 |
|---|---|
| Superseded by | |
| Normative reference (6) | IEC/TS 61850-2 EN 61850-7-1 EN 61850-7-2:2010 EN 61850-7-3:2011 EN 61850-7-4:2010 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.