CENELEC

Projet
| Reference | EN 62132-5:2006 |
|---|---|
| Title | Circuits intégrés - Mesure de l'immunité électromagnétique, 150 kHz à 1 GHz - Partie 5: Méthode de la cage de Faraday sur banc de travail |
| Project Number | 16128 |
| Abstract/Scope | Cette procédure de mesure décrit une méthode de mesure pour quantifier l'immunité RF des circuits intégrés (CI) montés sur une carte d'essai normalisée ou dans leur application finale de carte d'essai (PCB), aux perturbations électromagnétiques conductrices. |
| Status |
Published
|
Statut
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2006-01-27 |
| Current Stage code deadline | 2006-09-01 |
| Deadline date for vote |
Légal
| Directive(s) | EMC related (2004/108/EC) |
|---|---|
| Mandate(s) | |
| Order Voucher |
Détails
| IEC Technical Body | IEC/SC 47A |
|---|---|
| Reference Document | IEC 62132-5:2005 (EQV) |
| ICS | 31.200 - Integrated circuits. Microelectronics |
| Keywords | |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environnement
|
Clause
|
Categories - Aspects
|
Cycle de vie du produit
|
Information
|
|---|
Histoire
Dates de mise en application
| date of Ratification (DOR) (1) | 2005-12-01 |
|---|---|
| date of Availability (DAV) (2) | 2006-01-27 |
| date of Announcement (DOA) (3) | 2006-03-01 |
| date of Publication (DOP) (4) | 2006-09-01 |
| date of Withdrawal (DOW) (5) | 2008-12-01 |
Rélations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) | IEC 60050-131:2002 IEC 60050-161:1990 EN 61000-4-6:2007 corr. August 2007 EN 62132-1:2006 corr. November 2006 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
