CENELEC

Project
| Reference | EN 50109-2-4:1995 |
|---|---|
| Title | Hand crimping tools - Tools for the crimp termination of electric cables and wires for low frequency and radio frequency applications - Part 2-4: Particular requirements for centre contacts of RF connectors, series SMZ |
| Project Number | 1259 |
| Abstract/Scope | Part 2-4 of this European Standard specifies detail requirements, limiting dimensions and operating forces for hand crimping tools incorporating a system of multiple indentors of the 8-indent type, commonly known as `Octodent'. It includes test requirements for the tool crimping action, under load, using a test-piece |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 1995-06-22 |
| Current Stage code deadline | 1995-12-15 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 46 |
|---|---|
| Reference Document | |
| ICS | |
| Keywords | Tool; Crimping tool; Cable; Radio frequency connector; Centre contact |
| Note | To be implemented in all countries except FI * dop/dow postponed by 15 months |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 1993-09-22 |
|---|---|
| date of Availability (DAV) (2) | 1995-06-22 |
| date of Announcement (DOA) (3) | 1994-03-01 |
| date of Publication (DOP) (4) | 1995-12-15 |
| date of Withdrawal (DOW) (5) | 1995-12-15 |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
