International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference EN 62382:2013
Title Control systems in the process industry - Electrical and instrumentation loop check
Project Number 23064
Abstract/Scope IEC 62382:2012 describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). This second edition cancels and replaces the first edition published in 2006 and constitutes a technical revision. The main changes with respect to the previous edition are: The definition of the documents mentioned in the standards is in accordance with IEC 62708: Documents for Electrical and Instrumentation Projects in the Process Industry. Subclause 6.3 has been revised.
Status
Published

Status

Current Stage code 6060
Current Stage code date 2013-03-01
Current Stage code deadline 2013-09-13
Deadline date for vote  

Legal

Directive(s)  
Mandate(s)  
Order Voucher  

Details

IEC Technical Body IEC/SC 65E
Reference Document IEC 62382:2012 (EQV)
ICS 25.040.40 - Industrial process measurement and control
Keywords Instrumentation; Loop check
Note Supersedes EN 62382:2007
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
6060 2013-03-01 2013-09-13 export to doc file  EN  FR  DE
5099 2012-12-13 2013-01-10  
5060 2012-10-22 2012-11-12 export to doc file  EN
5020 2012-08-17 2012-10-19  
3090 2011-10-14 2011-12-31  
5060 2011-01-10 2011-01-31 export to doc file  EN
5020 2010-07-30 2011-01-07  
1090 2010-07-28 2010-07-30  

Implementation Dates

date of Ratification (DOR) (1) 2012-12-13
date of Availability (DAV) (2) 2013-03-01
date of Announcement (DOA) (3) 2013-03-13
date of Publication (DOP) (4) 2013-09-13
date of Withdrawal (DOW) (5) 2015-12-13

Relations

Supersedes EN 62382:2007
Superseded by  
Normative reference (6) EN 61131-2:2007
EN 62337:2012
EN 62424:2009
IEC 62708:201X

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.