CENELEC

Project
| Reference | EN 60086-3:2011 |
|---|---|
| Title | Primary batteries - Part 3: Watch batteries |
| Project Number | 22655 |
| Abstract/Scope | IEC 60086-3:2011(E) specifies dimensions, designation, methods of tests and requirements for primary batteries for watches. In several cases, a menu of test methods is given. When presenting battery electrical characteristics and/or performance data, the manufacturer specifies which test method was used. The major technical changes with respect to the previous edition are the drawings, a review of the table of electrochemical systems and a harmonization of the marking clause with the other standards of the IEC 60086 series. Moreover, the table of the leakage levels was extended by adding drawings with better visualization. This publication is published as a double logo standard. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2011-03-25 |
| Current Stage code deadline | |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 35 |
|---|---|
| Reference Document | IEC 60086-3:2011 (EQV) + corrigendum Sep. 2011 (EQV) |
| ICS | 29.220.10 - Primary cells and batteries 39.040.10 - Watches |
| Keywords | Battery; Primary; Watch battery |
| Note | Supersedes EN 60086-3:2005 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2011-03-02 |
|---|---|
| date of Availability (DAV) (2) | 2011-03-25 |
| date of Announcement (DOA) (3) | 2011-06-02 |
| date of Publication (DOP) (4) | 2011-12-02 |
| date of Withdrawal (DOW) (5) | 2014-03-02 |
Relations
| Supersedes | EN 60086-3:2005 |
|---|---|
| Superseded by | |
| Normative reference (6) | ISO 2859-1:1999 ISO 3951-1:2005 EN 60086-1:2011 EN 60086-2:2011 EN 60086-4:2007 EN 60086-5:2011 IEC 60410:1973 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
