CENELEC

Project
| Reference | EN 60811-100:2012 |
|---|---|
| Title | Electric and optical fibre cables - Test methods for non-metallic materials - Part 100: General |
| Project Number | 22905 |
| Abstract/Scope | IEC 60811-100:2012 describes general requirements and considerations that are applicable to all the test methods given in the particular parts, unless otherwise specified. This first edition of IEC 60811-100 collects together general matters that apply to the restructured IEC 60811 series. A detailed explanation is provided in the Introduction. Annex A provides full information on the relation between the current and the previous series. This revised series of IEC 60811 is based upon the principle of 'one test - one part'. One significant technical change that now applies throughout the series is a defined minimum scheme for the presentation of test reports. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2012-06-08 |
| Current Stage code deadline | 2013-01-16 |
| Deadline date for vote |
Legal
| Directive(s) | LVD (2006/95/EC) |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 20 |
|---|---|
| Reference Document | IEC 60811-100:2012 (EQV) |
| ICS | 29.035.01 - Insulating materials in general 29.060.20 - Cables |
| Keywords | Optic; Fibre; Cable; Non-metallic; |
| Note | Supersedes EN 60811-1-1:1995 (PART) + A1:2001 (PART), EN 60811-1-2:1995 (PART) + A2:2000 (PART), EN 60811-1-3:1995 (PART) + A1:2001 (PART), EN 60811-1-4:1995 (PART) + A2:2001 (PART), EN 60811-2-1:1998 (PART) + A1:2001 (PART), EN 60811-3-1:1995 (PART) + A1:1996 (PART) + A2:2001 (PART), EN 60811-3-2:1995 (PART) + A2:2004 (PART), EN 60811-4-1:2004 (PART), EN 60811-4-2:2004 (PART), EN 60811-5-1:1999 (PART) + A1:2004 (PART) * 2012-03-14: Publication editing allocated to cpalagi@cencenelec.eu |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2012-04-16 |
|---|---|
| date of Availability (DAV) (2) | 2012-06-08 |
| date of Announcement (DOA) (3) | 2012-07-16 |
| date of Publication (DOP) (4) | 2013-01-16 |
| date of Withdrawal (DOW) (5) | 2015-04-16 |
Relations
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
