International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference EN 62124:2005
Title Photovoltaic (PV) stand-alone systems - Design verification
Project Number 15334
Abstract/Scope Verifies system design and performance of stand-alone photovoltaic systems. The performance test consists of a check of the functionality, the autonomy and ability to recover after periods of low state-of-charge of the battery, and hence gives reasonable assurance that the system will not fail prematurely. The testing conditions are intended to represent the majority of climatic zones for which these systems are designed.
Status
Published

Status

Current Stage code 6060
Current Stage code date 2005-03-04
Current Stage code deadline 2005-11-01
Deadline date for vote  

Legal

Directive(s)  
Mandate(s) M/089
Order Voucher  

Details

IEC Technical Body IEC/TC 82
Reference Document IEC 62124:2004 (EQV)
ICS 27.160 - Solar energy engineering
Keywords PV system; Stand alone; Design
Note  
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
6060 2005-03-04 2005-11-01 export to doc file  EN  FR  DE
5099 2005-02-01 2005-05-01  
5061 2004-11-24 2005-02-01  
5020 2004-07-09 2004-09-10  
4099 2003-07-18 2003-09-30  
4020 2002-12-13 2003-05-16  
3099 2002-12-10 2002-12-13  
1000 2002-07-02 2003-01-02  

Implementation Dates

date of Ratification (DOR) (1) 2005-02-01
date of Availability (DAV) (2) 2005-03-04
date of Announcement (DOA) (3) 2005-05-01
date of Publication (DOP) (4) 2005-11-01
date of Withdrawal (DOW) (5) 2008-02-01

Relations


(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.