CENELEC

Project
| Reference | EN 60255-26:2009 |
|---|---|
| Title | Measuring relays and protection equipment - Part 26: Electromagnetic compatibility requirements |
| Project Number | 21164 |
| Abstract/Scope | IEC 60255-26:2008 is applicable to measuring relays and protection equipment for power system protection, including the control, monitoring and process interface equipment used with those systems; it specifies the essential requirements for electromagnetic compatibility for measuring relays and protection equipment intended to be used at industrial locations. The main difference of this new edition with respect to the previous one concerns the references to IEC 61000-4 and to CISPR 22. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2009-10-29 |
| Current Stage code deadline | 2010-06-01 |
| Deadline date for vote |
Legal
| Directive(s) | EMC pending (2004/108/EC) |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 95 |
|---|---|
| Reference Document | IEC 60255-26:2008 (EQV) |
| ICS | 29.120.70 - Relays 33.100.10 - Emission 33.100.20 - Immunity |
| Keywords | Relay; Protection; Electromagnetic compatibility; EMC |
| Note | Supersedes EN 60255-26:2005 + EN 50263:1999 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2009-09-01 |
|---|---|
| date of Availability (DAV) (2) | 2009-10-29 |
| date of Announcement (DOA) (3) | 2009-12-01 |
| date of Publication (DOP) (4) | 2010-06-01 |
| date of Withdrawal (DOW) (5) | 2012-09-01 |
Relations
| Supersedes | EN 50263:1999 EN 60255-26:2005 |
|---|---|
| Superseded by | FprEN 60255-26:2013 |
| Normative reference (6) | CISPR 22:2005 IEC 60255-11:1979 EN 60255-22-1:2008 EN 60255-22-2:1996 EN 60255-22-3:2008 EN 60255-22-4:2002 EN 60255-22-5:2002 EN 60255-22-6:2001 EN 60255-22-7:2003 EN 60255-25:2000 EN 61000-4-2:1995 A1:1998 A2:2001 EN 61000-4-3:2006 EN 61000-4-4:2004 EN 61000-4-5:2006 EN 61000-4-6:2007 corr. August 2007 : : EN 61000-4-8:1993 A1:2001 EN 61000-4-16:1998 A1:2004 EN 61000-4-18:2007 corr. September 2007 EN 61000-4-29:2000 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
