CENELEC

Project
| Reference | ENV 50230:1997 |
|---|---|
| Title | Aeronautical ground lighting electrical installation - Control and monitoring systems: General requirements |
| Project Number | 7118 |
| Abstract/Scope | This prestandard specifies general requirements for control and monitoring system of aviation ground lighting installation. The purpose of this prestandard is to provide a set of requirements which are applicable to the control and monitoring system of aviation ground lighting installation. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 1997-02-05 |
| Current Stage code deadline | 1998-07-02 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 97 |
|---|---|
| Reference Document | |
| ICS | 93.120 - Construction of airports |
| Keywords | Lighting; Aviation ground lighting installation; Monitoring system |
| Note | Revision work offered to IEC in the framework of the Dresden Agreement * D130/C014: Wait IEC publication revising this ENV prior to its withdrawal |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
|
Stage
|
Date
|
Deadline Date
|
Documents
|
|---|---|---|---|
| 6060 | 1997-02-05 | 1998-07-02 | |
| 6020 | 1996-08-02 | 1996-11-02 | |
| 5099 | 1996-07-02 | 1996-08-02 | |
| 5062 | 1996-06-11 | 1996-07-02 | |
| 5020 | 1996-01-26 | 1996-04-30 | |
| 1090 | 1995-11-30 | 1996-05-31 | |
| 3060 | 1995-10-19 | 1995-11-30 | |
| 3020 | 1993-04-06 | 1993-10-06 | |
| 2020 | 1992-09-29 | 1993-03-29 | |
| 1099 | 1992-06-18 | 1992-12-18 |
Implementation Dates
| date of Ratification (DOR) (1) | 1996-07-02 |
|---|---|
| date of Availability (DAV) (2) | 1997-02-05 |
| date of Announcement (DOA) (3) | - |
| date of Publication (DOP) (4) | - |
| date of Withdrawal (DOW) (5) | - |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
