| Reference | EN 62271-109:2009/FprA1:2013 |
|---|---|
| Title | High-voltage switchgear and controlgear - Part 109: Alternating-current series capacitor by-pass switches |
| Project Number | 24325 |
| Abstract/Scope | IEC 62271-109:2008 is applicable to a.c. series capacitor by-pass switches designed for outdoor installation and for operation at frequencies of 50 Hz and 60 Hz on systems having voltages above 52 kV. It is only applicable to by-pass switches for use in three-phase systems. This standard is also applicable to the operating devices of by-pass switches and to their auxiliary equipment. This second edition cancels and replaces the first edition, published in 2006, and constitutes a technical revision. This standard is to be read in conjunction with IEC 62271-100 and IEC 62271-1 (2007), to which it refers and which is applicable, unless otherwise specified in this standard. The main changes with respect to the previous edition are listed below: - By-passing test duty has been split. - Equivalence regarding applicability of test parameters were reviewed. - Recovery voltage waveshape during insertion test duty has been recalculated and optimized. An explanatory note on the calculation of the recovery voltage is given in Annex F. - Withdrawal of the electrical endurance class BP2. Such devices are now covered in informative Annex E. - Addition of Annex D which gives examples of typical by-pass switch ratings. |
| Status |
Approval stage
|
Status
| Current Stage code | 5060 |
|---|---|
| Current Stage code date | 2013-05-06 |
| Current Stage code deadline | 2013-05-27 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 17A |
|---|---|
| Reference Document | IEC 62271-109:2008/A1:201X (17A/1038/FDIS) (EQV) |
| ICS | |
| Keywords | High-voltage; Switchgear; Controlgear; Alternating-current; By-pass switch |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | |
|---|---|
| date of Availability (DAV) (2) | |
| date of Announcement (DOA) (3) | dor + 3 months |
| date of Publication (DOP) (4) | dor + 9 months |
| date of Withdrawal (DOW) (5) | dor + 36 months |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn