CENELEC

Project
| Reference | EN 60871-4:1996 |
|---|---|
| Title | Shunt capacitors for a.c. power systems having a rated voltage above 1 kV - Part 4: Internal fuses |
| Project Number | 7528 |
| Abstract/Scope | Applies to internal fuses which are designed to isolate faulty capacitor elements, in order to allow operation of the remaining parts of that capacitor unit and the bank. Such fuses are not a substitute for a switching device such as a circuit-breaker, or for an external protection of the capacitor bank. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 1996-09-11 |
| Current Stage code deadline | 1997-05-01 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 33 |
|---|---|
| Reference Document | IEC 60871-4:1996 (EQV) |
| ICS | 29.120.50 - Fuses and other overcurrent protection devices |
| Keywords | Capacitor; Shunt capacitor; AC; Internal fuse |
| Note | EN following parallel vote |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 1996-07-02 |
|---|---|
| date of Availability (DAV) (2) | 1996-09-11 |
| date of Announcement (DOA) (3) | 1996-11-01 |
| date of Publication (DOP) (4) | 1997-05-01 |
| date of Withdrawal (DOW) (5) | 1997-05-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | prEN 60871-4 |
| Normative reference (6) |
HD 525.1 S1:1989
A1:1991 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
