CENELEC

Project
| Reference | EN 61812-1:1996 |
|---|---|
| Title | Specified time relays for industrial use - Part 1: Requirements and tests |
| Project Number | 7706 |
| Abstract/Scope | Applies to specified time relays, such as time delay relays, for use in industrial applications (e.g. control, automation, signal and industrial equipment). |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 1996-12-23 |
| Current Stage code deadline | 1997-09-01 |
| Deadline date for vote |
Legal
| Directive(s) | LVD (2006/95/EC), EMC (2004/108/EC) |
|---|---|
| Mandate(s) | M/404 |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 94 |
|---|---|
| Reference Document | IEC 61812-1:1996 (EQV) |
| ICS | 29.120.70 - Relays |
| Keywords | Relay; Industrial use; Test |
| Note | EN following parallel vote * Corrigendum to EN issued February 1999 * Superseded by EN 61812-1:2011 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 1996-10-01 |
|---|---|
| date of Availability (DAV) (2) | 1996-12-23 |
| date of Announcement (DOA) (3) | 1997-03-01 |
| date of Publication (DOP) (4) | 1997-09-01 |
| date of Withdrawal (DOW) (5) | 1999-10-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | EN 61812-1:2011 |
| Normative reference (6) |
EN 55011:1991
EN 55022:1994 corr. August 1997 IEC 60050-441:1984 IEC 60050-446:1983 HD 588.1 S1:1991 EN 60062:1993 A11:2001 EN 60068-1:1994 HD 323.2.3 S2:1987 EN 60068-2-6:1995 EN 60068-2-27:1993 HD 566 S1:1990 HD 214 S2:1980 EN 60529:1991 corr. May 1993 EN 60664-1:2003 HD 625.3 S1:1997 EN 60695-2-1/0:1996 EN 60695-2-1/1:1996 EN 60695-2-1/2:1996 EN 60695-2-1/3:1996 EN 60721-3-3:1995 EN 60947-1:1991 corr. March 1993 corr. June 1997 A11:1994 EN 60947-5-1:1991 corr. March 1993 corr. June 1997 A12:1997 EN 60947-5-2:1997 EN 60999-1:1993 corr. March 1997 EN 61000-4-2:1995 EN 61000-4-3:1996 EN 61000-4-4:1995 EN 61000-4-5:1995 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
