CENELEC

Project
| Reference | EN 62054-11:2004 |
|---|---|
| Title | Electricity metering (a.c.) - Tariff and load control - Part 11: Particular requirements for electronic ripple control receivers |
| Project Number | 15400 |
| Abstract/Scope | specifies particular requirements for the type test of newly manufactured indoor electronic ripple control receivers for the reception and interpretation of pulses of a single audio frequency superimposed on the voltage of the electricity distribution network and for the execution of the corresponding switching operations. In this system the mains frequency is generally used to synchronize the transmitter and receivers. Neither the control frequency nor the encoding are standardized in this standard. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2004-10-28 |
| Current Stage code deadline | 2005-05-01 |
| Deadline date for vote |
Legal
| Directive(s) | EMC (2004/108/EC) |
|---|---|
| Mandate(s) | M/404 |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 13 |
|---|---|
| Reference Document | IEC 62054-11:2004 (EQV) |
| ICS | 91.140.50 - Electricity supply systems |
| Keywords | Metering equipment; Tariff; Load control; Receiver; Ripple control |
| Note | Partially supersedes EN 61037:1992 (+ corr. Dec. 1997) + A1:1996 + A2:1998 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2004-07-06 |
|---|---|
| date of Availability (DAV) (2) | 2004-10-28 |
| date of Announcement (DOA) (3) | 2004-10-01 |
| date of Publication (DOP) (4) | 2005-05-01 |
| date of Withdrawal (DOW) (5) | 2007-07-01 |
Relations
| Supersedes | EN 61037:1992 EN 61037:1992/corrigendum Dec. 1997 EN 61037:1992/A1:1996 EN 61037:1992/A2:1998 |
|---|---|
| Superseded by | |
| Normative reference (6) |
EN 62052-21:2004
|
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
