CENELEC

Project
| Reference | EN 61587-3:2006 |
|---|---|
| Title | Mechanical structures for electronic equipment - Tests for IEC 60917 and IEC 60297 - Part 3: Electromagnetic shielding performance tests for cabinets, racks and subracks |
| Project Number | 16786 |
| Abstract/Scope | Specifies the tests for empty cabinets and subracks concerning electromagnetic shielding performance, in the frequency range of 30 MHz to 2 000 MHz. Ensures physical integrity and environmental performance of cabinets and subracks, taking into account the need for different levels of performance in different applications. Was developed in close relationship to IEC 61000-5-7 but with the specific focus on subracks and cabinets and the determination of performance levels at the chosen frequency range. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2006-11-03 |
| Current Stage code deadline | 2007-07-01 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 48D |
|---|---|
| Reference Document | IEC 61587-3:2006 (EQV) |
| ICS | 31.240 - Mechanical structures for electronic equipment |
| Keywords | Electronic equipment; Rack; Cabinet; Mechanical structure; EMC shielding |
| Note | Superseded by EN 61587-3:2013 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2006-10-01 |
|---|---|
| date of Availability (DAV) (2) | 2006-11-03 |
| date of Announcement (DOA) (3) | 2007-01-01 |
| date of Publication (DOP) (4) | 2007-07-01 |
| date of Withdrawal (DOW) (5) | 2009-10-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | EN 61587-3:2013 |
| Normative reference (6) |
EN 55016-1-1:2007
HD 493.1 S1:1988 EN 60917-1:1998 EN 61000-4-3:2002 EN 61000-5-7:2001 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
