CENELEC
CLC/TC 65X |
Industrial-process measurement, control and automation |

Project
| Reference | EN 62382:2013 |
|---|---|
| Title | Control systems in the process industry - Electrical and instrumentation loop check |
| Project Number | 23064 |
| Abstract/Scope | IEC 62382:2012 describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). This second edition cancels and replaces the first edition published in 2006 and constitutes a technical revision. The main changes with respect to the previous edition are: The definition of the documents mentioned in the standards is in accordance with IEC 62708: Documents for Electrical and Instrumentation Projects in the Process Industry. Subclause 6.3 has been revised. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2013-03-01 |
| Current Stage code deadline | 2013-09-13 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 65E |
|---|---|
| Reference Document | IEC 62382:2012 (EQV) |
| ICS | 25.040.40 - Industrial process measurement and control |
| Keywords | Instrumentation; Loop check |
| Note | Supersedes EN 62382:2007 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2012-12-13 |
|---|---|
| date of Availability (DAV) (2) | 2013-03-01 |
| date of Announcement (DOA) (3) | 2013-03-13 |
| date of Publication (DOP) (4) | 2013-09-13 |
| date of Withdrawal (DOW) (5) | 2015-12-13 |
Relations
| Supersedes | EN 62382:2007 |
|---|---|
| Superseded by | |
| Normative reference (6) |
EN 61131-2:2007
EN 62337:2012 EN 62424:2009 IEC 62708:201X |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
