CENELEC
CLC/TC 65X |
Industrielle Prozessleit- und Automatisierungstechnik |

Projekt
| Reference | EN 61326-2-3:2013 |
|---|---|
| Title | Elektrische Mess-, Steuer-, Regel- und Laborgeräte - EMV-Anforderungen - Teil 2-3: Besondere Anforderungen - Prüfanordnung, Betriebsbedingungen und Leistungsmerkmale für Messgrößenumformer mit integrierter oder abgesetzter Signalaufbereitung |
| Project Number | 23329 |
| Abstract/Scope | |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2013-01-11 |
| Current Stage code deadline | 2013-05-14 |
| Deadline date for vote |
Legal
| Directive(s) | EMC (2004/108/EC) |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 65A |
|---|---|
| Reference Document | IEC 61326-2-3:2012 (EQV) |
| ICS | 17.220 - Electricity. Magnetism. Electrical and magnetic measurements 19.080 - Electrical and electronic testing 25.040.40 - Industrial process measurement and control 33.100 - Electromagnetic compatibility (EMC) |
| Keywords | |
| Note | 2012-07-18 - Publication editing allocated to cpalagi@cencenelec.eu * Supersedes EN 61326-2-3:2006 * To be read in conjunction with EN 61326-1 (PR=23326) |
| A-Deviation(s) | |
| Special National Condition(s) |
Umwelt
|
Abschnitt
|
Kategorie(n) – Aspekt(e)
|
Produkt-Lebenszyklus
|
Information
|
|---|
Geschichte
Übernahmedaten
| date of Ratification (DOR) (1) | 2012-08-14 |
|---|---|
| date of Availability (DAV) (2) | 2013-01-11 |
| date of Announcement (DOA) (3) | 2013-04-11 |
| date of Publication (DOP) (4) | 2013-07-11 |
| date of Withdrawal (DOW) (5) | 2015-08-14 |
Beziehungen
| Supersedes | EN 61326-2-3:2006 |
|---|---|
| Superseded by | |
| Normative reference (6) |
EN 61326-1:2013
|
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
