International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference EN 60938-2-2:1999
Title Fixed inductors for electromagnetic interference suppression - Part 2-2: Blank detail specification - Inductors for which safety tests are required (only)
Project Number 13265
Abstract/Scope Forms the basis for a uniform procedure for a common mark. It implements the approval schedule for safety tests only in EN 60938-2, requires a declaration of design for parameters relevant ot safety tests and prescribes conformance tests to be conducted on every lot prior to its release and re-qualification tests depending on changes of the design. May be more appropriate for components manufactured in mass production, whereas this specification may be necessary in those cases where approval and re-qualification tests contribute considerably to the costs of the product.
Status
Published

Status

Current Stage code 6060
Current Stage code date 1999-12-15
Current Stage code deadline 2000-09-01
Deadline date for vote  

Legal

Directive(s)  
Mandate(s)  
Order Voucher  

Details

IEC Technical Body IEC/TC 40
Reference Document IEC 60938-2-2:1999 (EQV)
ICS 29.100.10 - Magnetic components
31.020 - Electronic components in general
Keywords Inductor; Fixed inductor; Electromagnetic interference; Suppression; Safety test
Note EN following parallel vote
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
6060 1999-12-15 2000-09-01 export to doc file  EN
5099 1999-12-01 2000-04-01  
5062 1999-10-21 1999-12-01  
5020 1999-06-25 1999-09-15  
1090 1999-06-21 1999-06-25  

Implementation Dates

date of Ratification (DOR) (1) 1999-12-01
date of Availability (DAV) (2) 1999-12-15
date of Announcement (DOA) (3) 2000-03-01
date of Publication (DOP) (4) 2000-09-01
date of Withdrawal (DOW) (5) 2002-12-01

Relations

Supersedes  
Superseded by  
Normative reference (6)  

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.