International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference FprEN 62586-2:2013
Title Power quality measurement in power supply systems - Part 2: Functional tests and uncertainty requirements
Project Number 24160
Abstract/Scope IEC 62586-2:2013 specifies functional tests and uncertainty requirements for instruments whose functions include measuring, recording, and possibly monitoring power quality parameters in power supply systems, and whose measuring methods (class A or class S) are defined in IEC 61000-4-30. This standard applies to power quality instruments complying with IEC 62586-1. This standard may also be referred to by other product standards (e.g. digital fault recorders, revenue meters, MV or HV protection relays) specifying devices embedding class A or class S power quality functions according to IEC 61000-4-30. These requirements are applicable in single, dual- (split phase) and 3-phase a.c. power supply systems at 50 Hz or 60 Hz.
Status
Approval stage

Status

Current Stage code 5091
Current Stage code date 2014-02-03
Current Stage code deadline  
Deadline date for vote  

Legal

Directive(s) EMC (2004/108/EC)
Mandate(s)  
Order Voucher  

Details

IEC Technical Body IEC/TC 85
Reference Document IEC 62586-2:2013 (EQV)
ICS 17.220.20 - Measurement of electrical and magnetic quantities
Keywords Quality measurement; Power supply systems; Functional tests; Uncertainty requirements
Note Work started in CLC/SR 85 then transferred into CLC/TC 85X after disbandment of SR (D145/087)
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
5091 2014-02-03    
5060 2013-09-16 2013-10-07 export to doc file  EN
5020 2013-07-12 2013-09-13  
3090 2013-07-09 2013-07-12  
5060 2012-09-17 2012-10-08 export to doc file  EN
5020 2012-04-13 2012-09-14  
1090 2012-04-13 2012-04-13  

Implementation Dates

date of Ratification (DOR) (1)  
date of Availability (DAV) (2)  
date of Announcement (DOA) (3) dor + 3 months
date of Publication (DOP) (4) dor + 9 months
date of Withdrawal (DOW) (5) dor + 36 months

Relations

Supersedes  
Superseded by  
Normative reference (6)  

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.