CENELEC

Project
| Reference | EN 61347-2-7:2006 |
|---|---|
| Title | Lamp controlgear - Part 2-7: Particular requirements for d.c. supplied electronic ballasts for emergency lighting |
| Project Number | 16621 |
| Abstract/Scope | This part of IEC 61347 specifies particular safety requirements for d.c. supplied electronic ballasts for maintained and non-maintained emergency lighting purposes. It includes specific requirements for ballasts and control units for luminaires for emergency lighting as specified by IEC 60598-2-22. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2006-12-20 |
| Current Stage code deadline | 2007-08-01 |
| Deadline date for vote |
Legal
| Directive(s) | LVD (2006/95/EC) |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 34C |
|---|---|
| Reference Document | IEC 61347-2-7:2006 (EQV) |
| ICS | 29.140.99 - Other standards related to lamps |
| Keywords | Lamp; Controlgear; Ballast; Electronic ballast; Emergency lighting |
| Note | Corrigendum to EN issued December 2010 * Superseded by EN 61347-2-7:2012 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2006-11-01 |
|---|---|
| date of Availability (DAV) (2) | 2006-12-20 |
| date of Announcement (DOA) (3) | 2007-02-01 |
| date of Publication (DOP) (4) | 2007-08-01 |
| date of Withdrawal (DOW) (5) | 2009-11-01 |
Relations
| Supersedes | EN 61347-2-7:2001 EN 61347-2-7:2001/corrigendum Jul. 2003 |
|---|---|
| Superseded by | EN 61347-2-7:2012 |
| Normative reference (6) |
EN 60081:1998
EN 60598-2-22:1998 corr. February 1999 corr. December 2005 corr. October 2007 EN 60901:1996 EN 60921:2004 EN 60929:2006 corr. December 2006 EN 61347-1:2001 corr. July 2003 EN 61347-2-3:2001 corr. July 2003 corr. December 2010 EN 61558-1:1997 corr. April 2003 A11:2003 EN 61558-2-1:1997 EN 61558-2-6:1997 EN 61558-2-17:1997 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
