International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference FprHD 60364-5-559:2011/FprAA:2011
Title Low-voltage electrical installations - Part 5-559: Selection and erection of electrical equipment - Luminaires and lighting installations
Project Number 23624
Abstract/Scope IEC 60364-5-55:2011 covers requirements for the selection and erection of low-voltage generating sets and for the selection and erection of luminaires and lighting installations intended to be part of the fixed installation. This second edition cancels and replaces the first edition, published in 2001, its Amendment 1 (2001) and its Amendment 2 (2008). The major technical changes with respect to the previous edition are: - additional requirements for connection of luminaires to the fixed wiring; - modification of requirements regarding the fixing of luminaires; - inclusion of alternative solutions for connecting devices used for through wiring and for connection of luminaires to the supply; - withdrawal of Clause 556, as IEC 60364-5-56 now covers this matter.
Status
Approval stage

Status

Current Stage code 5098
Current Stage code date 2011-12-05
Current Stage code deadline  
Deadline date for vote  

Legal

Directive(s)  
Mandate(s)  
Order Voucher  

Details

IEC Technical Body IEC/TC 64
Reference Document  
ICS  
Keywords Building; Electrical installation; Selection; Luminaire; Lighting
Note FprAA covering common modifications merged with FprHD 60364-5-559:201X (pr=23208)
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
5098 2011-12-05    
5060 2011-12-05 2011-12-26 export to doc file  EN
5020 2011-09-30 2011-12-02 export to doc file  EN  FR
1090 2011-06-29 2011-09-30  

Implementation Dates

date of Ratification (DOR) (1)  
date of Availability (DAV) (2)  
date of Announcement (DOA) (3) dor + 6 months
date of Publication (DOP) (4) dor + 12 months
date of Withdrawal (DOW) (5) dor + 36 months

Relations

Supersedes  
Superseded by  
Normative reference (6)  

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.