International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference EN 60255-22-5:2011
Title Measuring relays and protection equipment - Part 22-5: Electrical disturbance tests - Surge immunity test
Project Number 21588
Abstract/Scope IEC 60255-22-5:2008 specifies the general requirements for surge immunity tests for measuring relays and protection equipment for power system protection, including the control, monitoring and process interface equipment used with those systems. Is based on IEC 61000-4-5. The objective of the tests is to confirm that the equipment under test will operate correctly when energized and subjected to high-energy disturbances on the power and interconnection lines, caused by surge voltages from switching and lightning effects. The main change in this new edition concerns line to earth tests.
Status
Published

Status

Current Stage code 6060
Current Stage code date 2011-04-01
Current Stage code deadline 2011-10-02
Deadline date for vote  

Legal

Directive(s)  
Mandate(s)  
Order Voucher  

Details

IEC Technical Body IEC/TC 95
Reference Document IEC 60255-22-5:2008 (EQV)
ICS 29.120.70 - Relays
Keywords Relay; Protection; Disturbance; Surge immunity; Test
Note Supersedes EN 60255-22-5:2002
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
6060 2011-04-01 2011-10-02 export to doc file  EN  FR  DE
5099 2011-01-02 2011-01-30  
5060 2008-11-04 2008-11-18 export to doc file  EN
5020 2008-08-29 2008-10-31  
3090 2008-08-01 2008-08-31  
5060 2008-04-28 2008-05-12 export to doc file  EN
5020 2007-11-23 2008-04-25  
1090 2007-11-20 2007-11-23  

Implementation Dates

date of Ratification (DOR) (1) 2011-01-02
date of Availability (DAV) (2) 2011-04-01
date of Announcement (DOA) (3) 2011-04-02
date of Publication (DOP) (4) 2011-10-02
date of Withdrawal (DOW) (5) 2014-01-02

Relations

Supersedes EN 60255-22-5:2002
Superseded by EN 60255-26:2013
Normative reference (6) EN 60255-6
EN 61000-4-5

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.