CENELEC

Project
| Reference | EN 60099-4:2004 |
|---|---|
| Title | Surge arresters - Part 4: Metal-oxide surge arresters without gaps for a.c. systems |
| Project Number | 15230 |
| Abstract/Scope | Applies to non-linear metal-oxide resistor type surge arresters without spark gaps designed to limit voltage surges on a.c. power circuits. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2004-08-31 |
| Current Stage code deadline | 2005-03-01 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 37 |
|---|---|
| Reference Document | IEC 60099-4:2004 (MOD) |
| ICS | 29.120.50 - Fuses and other overcurrent protection devices 29.240.10 - Substations. Surge arresters |
| Keywords | Surge arrester; Metal-oxide; AC system; Gap |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2004-05-01 |
|---|---|
| date of Availability (DAV) (2) | 2004-08-31 |
| date of Announcement (DOA) (3) | 2004-09-01 |
| date of Publication (DOP) (4) | 2005-03-01 |
| date of Withdrawal (DOW) (5) | 2007-05-01 |
Relations
| Supersedes | EN 60099-4:1993 EN 60099-4:1993/A1:1998 EN 60099-4:1993/A2:2002 |
|---|---|
| Superseded by | FprEN 60099-4:2013 |
| Normative reference (6) | CISPR 16-1:1999 CISPR 18-2:1986 HD 588.1 S1:1991 EN 60060-2:1994 A11:1998 EN 60068-2-11:1999 EN 60068-2-14:1999 EN 60068-2-42:2003 EN 60071-1:1995 EN 60071-2:1997 EN 60270:2001 EN 60507:1993 IEC/TR 60815:1986 IEC 61109:1992 EN 61166:1993 EN 61330:1996 EN 62271-200:2004 EN 62271-203:2004 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
