CENELEC

Projekt
| Reference | EN 61243-3:2010 |
|---|---|
| Title | Arbeiten unter Spannung - Spannungsprüfer - Teil 3: Zweipoliger Spannungsprüfer für Niederspannungsnetze |
| Project Number | 21824 |
| Abstract/Scope | |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2010-05-07 |
| Current Stage code deadline | 2011-02-01 |
| Deadline date for vote |
Legal
| Directive(s) | LVD (2006/95/EC) |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 78 |
|---|---|
| Reference Document | IEC 61243-3:2009 (EQV) |
| ICS | 13.260 - Protection against electric shock 29.240.20 - Power transmission and distribution lines 29.260.99 - Other electrical equipment for working in special conditions |
| Keywords | |
| Note | Supersedes EN 61243-3:1998 + corr. Feb. 2002 |
| A-Deviation(s) | |
| Special National Condition(s) |
Umwelt
|
Abschnitt
|
Kategorie(n) – Aspekt(e)
|
Produkt-Lebenszyklus
|
Information
|
|---|
Geschichte
Übernahmedaten
| date of Ratification (DOR) (1) | 2010-05-01 |
|---|---|
| date of Availability (DAV) (2) | 2010-05-07 |
| date of Announcement (DOA) (3) | 2010-08-01 |
| date of Publication (DOP) (4) | 2011-02-01 |
| date of Withdrawal (DOW) (5) | 2013-05-01 |
Beziehungen
| Supersedes | EN 61243-3:1998 EN 61243-3:1998/corrigendum Feb. 2002 |
|---|---|
| Superseded by | |
| Normative reference (6) | ISO 286-1:1988 ISO 286-2:1988 ISO 354:2003 ISO 3744 ISO 3745:2003 ISO 7000 EN 60068-2-6:2008 EN 60068-2-31 EN 60068-2-75 EN 60112:2003 HD 402 S2:1984 IEC/TS 60479-1 EN 60529 EN 60664-1 EN 60664-3:2003 EN 60695-10-2 EN 60942:2003 EN 61010-1 EN 61010-031 EN 61140 EN 61180-1:1994 EN 61180-2:1994 EN 61260:1995 EN 61318:2008 EN 61326-1 EN 61477:2009 corr. March 2010 EN 61557-7 EN 61672-1:2003 IEC 60417-DB |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
