| Reference | EN 61850-4:2011 |
|---|---|
| Title | Communication networks and systems for power utility automation - Part 4: System and project management |
| Project Number | 22715 |
| Abstract/Scope | IEC 61850-4:2011 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems. This publication is of core relevance for Smart Grid. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2011-06-10 |
| Current Stage code deadline | 2012-02-16 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 57 |
|---|---|
| Reference Document | IEC 61850-4:2011 (EQV) |
| ICS | 33.200 - Telecontrol. Telemetering |
| Keywords | Communication; Network; Power utility; Automation |
| Note | Supersedes EN 61850-4:2002 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2011-05-16 |
|---|---|
| date of Availability (DAV) (2) | 2011-06-10 |
| date of Announcement (DOA) (3) | 2011-08-16 |
| date of Publication (DOP) (4) | 2012-02-16 |
| date of Withdrawal (DOW) (5) | 2014-05-16 |
Relations
| Supersedes | EN 61850-4:2002 |
|---|---|
| Superseded by | |
| Normative reference (6) |
EN 60848
EN 61082 series EN 61175 EN 61850-6 EN 61850 series EN 81346 series EN 81346-2 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.