International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference EN 61000-4-23:2000
Title Electromagnetic compatibility (EMC) - Part 4-23: Testing and measurement techniques - Test methods for protective devices for HEMP and other radiated disturbances
Project Number 12944
Abstract/Scope Provides the basic reasons behind HEMP testing and gives a brief description of the most important concepts for shielding element testing. For each test, the following basic information is provided: - theoretical foundation of the test (the test concept); - test set-up; - required equipment; - test procedures; - data processing.
Status
Published

Status

Current Stage code 6060
Current Stage code date 2000-12-21
Current Stage code deadline 2001-08-01
Deadline date for vote  

Legal

Directive(s) EMC related (2004/108/EC)
Mandate(s) M/490
Order Voucher  

Details

IEC Technical Body IEC/SC 77C
Reference Document IEC 61000-4-23:2000 (EQV)
ICS 33.100.99 - Other aspects related to EMC
Keywords Electromagnetic compatibility; HEMP radiated disturbance; Protective device; Test
Note EN following parallel vote
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
6060 2000-12-21 2001-08-01 export to doc file  EN
5099 2000-11-01 2001-03-01  
5062 2000-09-05 2000-11-01  
5020 2000-05-12 2000-07-31  
4099 2000-05-08 2000-05-12  
4020 1998-12-11 1999-05-17  
3099 1998-12-07 1998-12-11  

Implementation Dates

date of Ratification (DOR) (1) 2000-11-01
date of Availability (DAV) (2) 2000-12-21
date of Announcement (DOA) (3) 2001-02-01
date of Publication (DOP) (4) 2001-08-01
date of Withdrawal (DOW) (5) 2003-11-01

Relations

Supersedes  
Superseded by  
Normative reference (6) ANSI/IEEE 488.1:1987
IEC 60050-161:1990
IEC 60096-1:1986
IEC 60625-1:1993
EN 61000-2-9:1996
IEC/TR 61000-5-3:1999

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.