CENELEC

Project
| Reference | EN 62446:2009 |
|---|---|
| Title | Grid connected photovoltaic systems – Minimum requirements for system documentation, commissioning tests and inspection |
| Project Number | 21367 |
| Abstract/Scope | IEC 62446:2009 defines the minimal information and documentation required to be handed over to a customer following the installation of a grid connected PV system. Also describes the minimum commissioning tests, inspection criteria and documentation expected to verify the safe installation and correct operation of the system. Is written for grid connected PV systems only. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2009-12-08 |
| Current Stage code deadline | 2010-07-01 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 82 |
|---|---|
| Reference Document | IEC 62446:2009 (EQV) |
| ICS | 27.160 - Solar energy engineering |
| Keywords | Grid; Documentation; Commissioning tests; Inspection |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2009-10-01 |
|---|---|
| date of Availability (DAV) (2) | 2009-12-08 |
| date of Announcement (DOA) (3) | 2010-01-01 |
| date of Publication (DOP) (4) | 2010-07-01 |
| date of Withdrawal (DOW) (5) | 2012-10-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) | HD 60364 series HD 60364-6:2007 HD 60364-7-712:2005 corr. April 2006 IEC/TR 60755:2008 EN 61557 series EN 61730-1:2007 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
