CENELEC

Project
| Reference | EN 62464-2:2011 |
|---|---|
| Title | Magnetic resonance equipment for medical imaging - Part 2: Classification criteria for pulse sequences |
| Project Number | 22708 |
| Abstract/Scope | IEC 62464-2:2010 specifies the description of pulse sequences of magnetic resonance imaging. The classification in this standard is suitable for: - tender texts; - image annotation; - protocol definition; - technical publications. IEC 62464-2:2010 does not apply to magnetic resonance spectroscopy. The classification does not focus on image contrast (T1, T2, proton density), as this is defined by pulse sequence parameters (e.g. repetition time, echo time) and is not a property of the pulse sequence alone. The pulse sequence classification does not specify the k-space acquisition scheme, reconstruction algorithm or post-processing. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2011-02-11 |
| Current Stage code deadline | 2011-11-01 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 62B |
|---|---|
| Reference Document | IEC 62464-2:2010 (EQV) |
| ICS | 11.040.55 - Diagnostic equipment |
| Keywords | Medical;Magnetic; Resonance; Imaging; Pulse sequence |
| Note | |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2011-02-01 |
|---|---|
| date of Availability (DAV) (2) | 2011-02-11 |
| date of Announcement (DOA) (3) | 2011-05-01 |
| date of Publication (DOP) (4) | 2011-11-01 |
| date of Withdrawal (DOW) (5) | 2014-02-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) |
EN 60601-2-33
IEC/TR 60788 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
