CENELEC

Project
| Reference | EN 61000-3-11:2000 |
|---|---|
| Title | Electromagnetic compatibility (EMC) - Part 3-11: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems - Equipment with rated current <= 75 A and subject to conditional connection |
| Project Number | 13823 |
| Abstract/Scope | This part of EN 61000 is concerned with the emission of voltage changes, voltage fluctuations and flicker produced by equipment and impressed on the public low-voltage supply system. It specifies the limits of voltage changes produced by equipment tested under specified conditions. Equipment tests made in accordance with this part of EN 61000 are type tests. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2000-11-06 |
| Current Stage code deadline | 2001-08-01 |
| Deadline date for vote |
Legal
| Directive(s) | RTTED (1999/5/EC), EMC (2004/108/EC) |
|---|---|
| Mandate(s) | M/404; M/490 |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 77A |
|---|---|
| Reference Document | IEC 61000-3-11:2000 (EQV) |
| ICS | 33.100.10 - Emission |
| Keywords | Electromagnetic compatibility; Voltage; Fluctuation; Flicker; Conditional connection |
| Note | EN following parallel vote |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2000-11-01 |
|---|---|
| date of Availability (DAV) (2) | 2000-11-06 |
| date of Announcement (DOA) (3) | 2001-02-01 |
| date of Publication (DOP) (4) | 2001-08-01 |
| date of Withdrawal (DOW) (5) | 2003-11-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) | IEC 60050-161:1990 IEC 60725:1981 EN 61000-3-3:1995 corr. July 1997 |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
