International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference FprEN 61558-2-10:2013
Title Safety of transformers, reactors, power supply units and combinations thereof - Part 2-10: Particular requirements and tests for separating transformers with high insulation level and separating transformers with output voltages exceeding 1000 V
Project Number 24354
Abstract/Scope IEC 61558-2-10:2014 deals with the safety of separating transformers with high insulation level and separating transformers with output voltages exceeding 1 000 V. Transformers incorporating electronic circuits are also covered by this standard. This first edition cancels and replaces Chapter ll Section Three of IEC 60989 published in 1991. It constitutes a technical revision. The main changes consist of a) updating this part in accordance with IEC 61558-1:2005, and b) adding power supply units to the scope. The attention of National Committees is drawn to the fact that equipment manufacturers and testing organizations may need a transitional period following publication of a new, amended or revised IEC publication in which to make products in accordance with the new requirements and to equip themselves for conducting new or revised tests. It is the recommendation of the committee that the content of this publication be adopted for implementation nationally not earlier than 12 months from the date of publication. The transitional period is not longer than 3 years after the publication of this standard.
Status
Approval stage

Status

Current Stage code 5060
Current Stage code date 2014-02-24
Current Stage code deadline 2014-03-17
Deadline date for vote  

Legal

Directive(s)  
Mandate(s)  
Order Voucher  

Details

IEC Technical Body IEC/TC 96
Reference Document IEC 61558-2-10:2014 (EQV)
ICS 29.180 - Transformers. Reactors
Keywords  
Note  
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
5060 2014-02-24 2014-03-17 export to doc file  EN
5020 2013-12-20 2014-02-21  
3090 2013-12-17 2013-12-20  
5060 2013-01-07 2013-01-28 export to doc file  EN
5020 2012-07-20 2013-01-04  
1090 2012-07-17 2012-07-20  

Implementation Dates

date of Ratification (DOR) (1)  
date of Availability (DAV) (2)  
date of Announcement (DOA) (3) dor + 3 months
date of Publication (DOP) (4) dor + 9 months
date of Withdrawal (DOW) (5) dor + 36 months

Relations

Supersedes  
Superseded by  
Normative reference (6)  

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.