CENELEC

Project
| Reference | EN 55024:1998/A1:2001 |
|---|---|
| Title | Information technology equipment - Immunity characteristics - Limits and methods of measurement |
| Project Number | 13727 |
| Abstract/Scope | Defines the immunity test requirements for information technology equipment (ITE, as defined in CISPR 22) in relation to continuous and transient, conducted and radiated disturbances, including electrostatic discharges (ESD). Procedures are defined for the measurement of ITE and limits are specified which are developed for ITE and within the frequency range from 0 Hz to 400GHz.This publication establishes requirements which will provide an adequate level of intrinsic immunity so that the equipment will operate as intended in its environment. The test requirements are specified for each port considered. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2001-10-11 |
| Current Stage code deadline | 2002-07-01 |
| Deadline date for vote |
Legal
| Directive(s) | RTTED (1999/5/EC), EMC (2004/108/EC) |
|---|---|
| Mandate(s) | M/404; M/490 |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC CISPR/I |
|---|---|
| Reference Document | CISPR 24:1997/A1:2001 (EQV) |
| ICS | 33.100.20 - Immunity |
| Keywords | Information technology equipment; Immunity; Measurement |
| Note | Incorporates work on PR 13726 & 13737 * EN following parallel vote * D115/098: SC 210A disbanded * Superseded by EN 55024:2010 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2001-10-01 |
|---|---|
| date of Availability (DAV) (2) | 2001-10-11 |
| date of Announcement (DOA) (3) | 2002-01-01 |
| date of Publication (DOP) (4) | 2002-07-01 |
| date of Withdrawal (DOW) (5) | 2004-10-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | EN 55024:2010 |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
