International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Projet

Reference EN 62264-1:2008
Title Intégration des systèmes entreprise-contrôle - Partie 1: Modèles et terminologie
Project Number 21282
Abstract/Scope décrit le contenu de l'interface entre les fonctions de contrôles de fabrication et les autres fonctions de l'entreprise. Les interfaces considérées sont les interfaces entre les Niveaux 3 et 4 du modèle hiérarchique défini par cette norme. Le but est de réduire le risque, le coût et les erreurs associés à la mise en place de ces interfaces.
Status
Published

Statut

Current Stage code 6060
Current Stage code date 2008-01-09
Current Stage code deadline 2008-12-01
Deadline date for vote  

Légal

Directive(s)  
Mandate(s)  
Order Voucher  

Détails

IEC Technical Body IEC/SC 65A
Reference Document IEC 62264-1:2003 (EQV)
ICS 25.040 - Industrial automation systems
35.240.50 - IT applications in industry
Keywords  
Note  
A-Deviation(s)  
Special National Condition(s)  

Environnement

Clause
Categories - Aspects
Cycle de vie du produit
Information

Histoire

Stage
Date
Deadline Date
Documents
6060 2008-01-09 2008-12-01 export to doc file  EN  FR  DE
5099 2007-12-01 2008-04-01  
5060 2007-11-06 2007-11-19 export to doc file  EN
5020 2007-06-01 2007-11-02 export to doc file  EN
1090 2007-04-11 2007-05-11  

Dates de mise en application

date of Ratification (DOR) (1) 2007-12-01
date of Availability (DAV) (2) 2008-01-09
date of Announcement (DOA) (3) 2008-06-01
date of Publication (DOP) (4) 2008-12-01
date of Withdrawal (DOW) (5) 2010-12-01

Rélations

Supersedes  
Superseded by FprEN 62264-1:2013
Normative reference (6) ISO 10303-1:1994
ISO 15531-1:2004
ISO 15704:2000
ISO/IEC 19501:2005
EN 61512-1:1999

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.