CENELEC

Projekt
| Reference | HD 60364-5-559:2012 |
|---|---|
| Title | Errichten von Niederspannungsanlagen - Teil 5-559: Auswahl und Errichtung elektrischer Betriebsmittel - Leuchten und Beleuchtungsanlagen |
| Project Number | 23208 |
| Abstract/Scope | |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2012-05-11 |
| Current Stage code deadline | 2013-03-14 |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 64 |
|---|---|
| Reference Document | IEC 60364-5-55:2011 (MOD) |
| ICS | 91.140 - Installations in buildings |
| Keywords | |
| Note | Supersedes HD 60364-5-559:2005 + corr. Oct.2007 * HD based only on Clause 559 of IEC 60364-5-55:2001/A3 which became new edition at FDIS * Incorporates FprAA (PR=23624) covering CMs * 2012-03-14: Publication editing allocated to svandriessche@cencenelec.eu |
| A-Deviation(s) | |
| Special National Condition(s) | AT, DE, DK, GB |
Umwelt
|
Abschnitt
|
Kategorie(n) – Aspekt(e)
|
Produkt-Lebenszyklus
|
Information
|
|---|
Geschichte
Übernahmedaten
| date of Ratification (DOR) (1) | 2012-03-14 |
|---|---|
| date of Availability (DAV) (2) | 2012-05-11 |
| date of Announcement (DOA) (3) | 2012-09-14 |
| date of Publication (DOP) (4) | 2013-03-14 |
| date of Withdrawal (DOW) (5) | 2015-03-14 |
Beziehungen
| Supersedes |
HD 60364-5-559:2005
HD 60364-5-559:2005/corrigendum Oct. 2007 |
|---|---|
| Superseded by | |
| Normative reference (6) | ISO 8528-12 IEC 60050-195 IEC 60050-826 EN 60079 series IEC 60245-3 IEC 60331-11 IEC 60331-21 HD 60364-1:2008 HD 60364-4-41:2007 corr. July 2007 HD 60364-4-42 HD 60364-4-43 IEC 60364-5-53:2001 HD 60364-7-712 HD 60364-7-717 EN 60570 EN 60598 series EN 60598-2-13:2006 corr. December 2006 EN 60598-2-22:1998 corr. February 1999 corr. December 2005 corr. October 2007 EN 60670 series EN 60670-21 EN 60702-1 EN 60702-2 EN 60998 series EN 61048:2006 EN 61535 EN 61995 series |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
