Project

Reference FprHD 60364-5-54:2010/FprAA:2011
Title Low-voltage electrical installations - Part 5-54: Selection and erection of electrical equipment - Earthing arrangements and protective conductors
Project Number 23335
Abstract/Scope IEC 60364-5-54:2011 addresses the earthing arrangements and protective conductors including protective bonding conductors in order to satisfy the safety of the electrical installation. This third edition cancels and replaces the second edition, published in 2002, and constitutes a technical revision. The main changes with respect to the previous edition are listed below: - clarification of the definition of protective conductor; - improved specification of mechanical characteristics of the earth electrode; - introduction of earth electrode for protection against electric shock and lighting protection; - annexes describing concrete-embedded foundation earth electrodes and soil-embedded earth electrode. IEC 60364-5-54:2011 has the status of a basic safety publication in accordance with IEC Guide 104.
Status
Approval stage

Status

Current Stage code 5098
Current Stage code date 2011-04-07
Current Stage code deadline  
Deadline date for vote  

Legal

Directive(s)  
Mandate(s)  
Order Voucher  

Details

IEC Technical Body  
Reference Document  
ICS  
Keywords Building; Electrical installation; Earthing arrangement; Conductor; Protection
Note Amendment requested to add SNCs and A deviations to FprHD 60364-5-54:2010 (PR=22280) * FprAA merged with PR= 22820
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
5098 2011-04-07    
5060 2011-04-04 2011-04-25 export to doc file  EN
5020 2011-01-28 2011-04-01 export to doc file  EN
1090 2011-01-24 2011-01-28  

Implementation Dates

date of Ratification (DOR) (1)  
date of Availability (DAV) (2)  
date of Announcement (DOA) (3) dor + 6 months
date of Publication (DOP) (4) dor + 12 months
date of Withdrawal (DOW) (5) dor + 36 months

Relations

Supersedes  
Superseded by  
Normative reference (6)  

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.