International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference EN 61000-4-17:1999/A1:2004
Title Electromagnetic compatibility (EMC) - Part 4-17: Testing and measurement techniques - Ripple on d.c. input power port immunity test
Project Number 14734
Abstract/Scope Defines test methods for immunity to ripple at the d.c. input power port of electrical or electronic equipment. Applies to low-voltage d.c. power ports of equipment supplied by external rectifier systems, or batteries which are being charged. This standard defines - test voltage waveform; - range of test levels; - test generator; - test set-up; - test procedure.
Status
Published

Status

Current Stage code 6060
Current Stage code date 2004-05-19
Current Stage code deadline 2005-05-01
Deadline date for vote  

Legal

Directive(s) EMC related (2004/108/EC)
Mandate(s) M/490
Order Voucher  

Details

IEC Technical Body IEC/SC 77A
Reference Document IEC 61000-4-17:1999/A1:2001 (EQV)
ICS 33.100.20 - Immunity
Keywords Electromagnetic compatibility; Immunity test; Ripple; DC; Input power port
Note  
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
6060 2004-05-19 2005-05-01 export to doc file  EN
5099 2004-05-01 2004-09-01  
5061 2004-03-26 2004-05-01  
5020 2003-08-22 2004-02-20  
1090 2001-09-13 2002-03-13  

Implementation Dates

date of Ratification (DOR) (1) 2004-05-01
date of Availability (DAV) (2) 2004-05-19
date of Announcement (DOA) (3) 2004-11-01
date of Publication (DOP) (4) 2005-05-01
date of Withdrawal (DOW) (5) 2007-05-01

Relations

Supersedes  
Superseded by  
Normative reference (6)  

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.