International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference EN 62446:2009
Title Grid connected photovoltaic systems – Minimum requirements for system documentation, commissioning tests and inspection
Project Number 21367
Abstract/Scope IEC 62446:2009 defines the minimal information and documentation required to be handed over to a customer following the installation of a grid connected PV system. Also describes the minimum commissioning tests, inspection criteria and documentation expected to verify the safe installation and correct operation of the system. Is written for grid connected PV systems only.
Status
Published

Status

Current Stage code 6060
Current Stage code date 2009-12-08
Current Stage code deadline 2010-07-01
Deadline date for vote  

Legal

Directive(s)  
Mandate(s)  
Order Voucher  

Details

IEC Technical Body IEC/TC 82
Reference Document IEC 62446:2009 (EQV)
ICS 27.160 - Solar energy engineering
Keywords Grid; Documentation; Commissioning tests; Inspection
Note  
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
6060 2009-12-08 2010-07-01 export to doc file  EN  FR  DE
5099 2009-10-01 2009-12-01  
5061 2009-08-27 2009-10-01  
5060 2009-03-30 2009-04-13 export to doc file  EN
5020 2009-02-20 2009-03-27  
3090 2008-12-05 2009-02-28  
5060 2007-12-10 2007-12-24 export to doc file  EN
5020 2007-07-06 2007-12-07  
1090 2007-07-03 2007-07-06  

Implementation Dates

date of Ratification (DOR) (1) 2009-10-01
date of Availability (DAV) (2) 2009-12-08
date of Announcement (DOA) (3) 2010-01-01
date of Publication (DOP) (4) 2010-07-01
date of Withdrawal (DOW) (5) 2012-10-01

Relations

Supersedes  
Superseded by FprEN 62446:2014
Normative reference (6) HD 60364 series
HD 60364-6:2007
HD 60364-7-712:2005
corr. April 2006
IEC/TR 60755:2008
EN 61557 series
EN 61730-1:2007

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.