International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference EN 62264-1:2013
Title Enterprise-control system integration - Part 1: Models and terminology
Project Number 24022
Abstract/Scope IEC 62264-1:2013 describes the manufacturing operations management domain (Level 3) and its activities, and the interface content and associated transactions within Level 3 and between Level 3 and Level 4. This description enables integration between the manufacturing operations and control domain (Levels 3, 2, 1) and the enterprise domain (Level 4). Its goals are to increase uniformity and consistency of interface terminology and reduce the risk, cost, and errors associated with implementing these interfaces. IEC 62264-1 can be used to reduce the effort associated with implementing new product offerings. This second edition cancels and replaces the first edition published in 2003. It constitutes a technical revision and includes the following significant technical changes with respect to the previous edition: - the functional hierarchy in 5.2 was extended using the definitions from IEC 62264-3; - the equipment hierarchy in 5.3 was extended using the definitions from IEC 62264-3; - a physical asset equipment model was added in 5.3; - the generic model of manufacturing operations management categories in Clause 7 was added using information from IEC 62264-3; - the formal UML models that were in Clause 7 were moved to IEC 62264-2 and the remaining data definitions are now in Clause 8; - the capacity and capability model in Clause 8 was extended; - new Annexes A and B were moved from IEC 62264-3; - Subclause 5.5 on the decision hierarchy was removed and a reference added to ISO 15704; - Annex C, D, E were moved to a Technical Report; - Annex F was removed.
Status
Published

Status

Current Stage code 6060
Current Stage code date 2013-09-27
Current Stage code deadline 2014-03-26
Deadline date for vote  

Legal

Directive(s)  
Mandate(s)  
Order Voucher  

Details

IEC Technical Body IEC/SC 65E
Reference Document IEC 62264-1:2013 (EQV)
ICS 25.040 - Industrial automation systems
35.240.50 - IT applications in industry
Keywords Enterprise; Integration; Model; Terminology
Note Supersedes EN 62264-1:2008 * 2013-06-10: Publication allocated to cpalagi@cencenelec.eu
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
6060 2013-09-27 2014-03-26 export to doc file  EN  FR  DE
5099 2013-06-26 2013-07-24  
5060 2013-03-18 2013-04-08 export to doc file  EN
5020 2013-01-11 2013-03-15  
3090 2013-01-08 2013-01-11  
5060 2012-07-16 2012-08-06 export to doc file  EN
5020 2012-02-10 2012-07-13  
1090 2012-02-07 2012-02-10  

Implementation Dates

date of Ratification (DOR) (1) 2013-06-26
date of Availability (DAV) (2) 2013-09-27
date of Announcement (DOA) (3) 2013-09-26
date of Publication (DOP) (4) 2014-03-26
date of Withdrawal (DOW) (5) 2016-06-26

Relations

Supersedes EN 62264-1:2008
Superseded by  
Normative reference (6) ISO 15704
ISO/IEC 19501
EN 61512-1
EN 62264-2
EN 62264-3
EN 62264-5

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.