International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Project

Reference prHD 60364-5-53
Title Electrical installations of buildings - Part 5-53: Selection and erection of electrical equipment - Protection, isolation, switching, control and monitoring
Project Number 20493
Abstract/Scope  
Status
Approval stage

Status

Current Stage code 5098
Current Stage code date 2009-09-30
Current Stage code deadline  
Deadline date for vote  

Legal

Directive(s)  
Mandate(s)  
Order Voucher  

Details

IEC Technical Body IEC/TC 64
Reference Document IEC 60364-5-53:201X (64/1571/FDIS) (EQV)
ICS  
Keywords Low-voltage; Protection; Isolation; Switching control;Monitoring
Note 64/1571/FDIS, future Edition 4 of IEC 60364-5-53, has been superseded by 64/1594/CDV, future A2 to Edition 3 of IEC 60364-5-53, which may not be harmonized through parallel vote (Edition 3 of IEC being not harmonized) * 2009-09 IEC decision: Project back to PWI
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
5098 2009-09-30    
5061 2007-04-23 2007-06-01  
5060 2007-02-27 2007-03-31 export to doc file  EN
5020 2006-12-22 2007-02-23  
4099 2006-12-19 2006-12-22  
5060 2006-06-20 2006-07-04 export to doc file  EN
5020 2006-01-13 2006-06-16  
1090 2006-01-10 2006-01-13  

Implementation Dates

date of Ratification (DOR) (1)  
date of Availability (DAV) (2)  
date of Announcement (DOA) (3) -
date of Publication (DOP) (4) -
date of Withdrawal (DOW) (5) -

Relations

Supersedes  
Superseded by  
Normative reference (6)  

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.