| Reference | prEN 61839 |
|---|---|
| Title | Nuclear power plants - Design of control rooms - Functional analysis and assignment |
| Project Number | 23237 |
| Abstract/Scope | Specifies functional analysis and assignment procedures for the design of the control-room system for nuclear power plants and gives rules for developing criteria for the assignment of functions. Supplements IEC 60964. Is applicable to the design of new control-rooms or to backfits to existing control-rooms. |
| Status |
Committee stage
|
Status
| Current Stage code | 1099 |
|---|---|
| Current Stage code date | 2011-02-01 |
| Current Stage code deadline | |
| Deadline date for vote | 2013-05-31 |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 45A |
|---|---|
| Reference Document | IEC 61839:2000 (EQV) |
| ICS | |
| Keywords | Nuclear; Power plant; Design; Control room; Functional analysis |
| Note | D138/C043: NWI approved with target date for vote = 2013-05-31 * Final decision to be taken at March 2011 meeting: PQ if no objection received from DE NC by 2011-02-28 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | |
|---|---|
| date of Availability (DAV) (2) | |
| date of Announcement (DOA) (3) | - |
| date of Publication (DOP) (4) | - |
| date of Withdrawal (DOW) (5) | - |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.