CENELEC

Project
| Reference | EN 62058-21:2010/AA |
|---|---|
| Title | Electricity metering equipment (a.c.) - Acceptance inspection - Part 21: Particular requirements for electromechanical meters for active energy (classes 0,5, 1 and 2 and class indexes A and B) |
| Project Number | 21302 |
| Abstract/Scope | IEC 62058-21:2008 specifies particular requirements for acceptance inspection of newly manufactured direct connected or transformer operated electromechanical meters for active energy (classes 0,5, 1 and 2) delivered in lots in quantities above 50. The method of acceptance of smaller lots should be agreed upon by the manufacturer and the customer. |
| Status |
Approval stage
|
Status
| Current Stage code | 5098 |
|---|---|
| Current Stage code date | 2010-06-01 |
| Current Stage code deadline | |
| Deadline date for vote |
Legal
| Directive(s) | MID (2004/22/EC) |
|---|---|
| Mandate(s) | M/347 |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 13 |
|---|---|
| Reference Document | |
| ICS | |
| Keywords | Metering; Acceptance; Active energy; Electromechanical meters |
| Note | Merged with EN 62058-21:2010 (PR=16708) |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
|
Stage
|
Date
|
Deadline Date
|
Documents
|
|---|---|---|---|
| 5098 | 2010-06-01 | ||
| 5099 | 2010-06-01 | 2010-10-01 | |
| 5061 | 2010-04-27 | 2010-06-01 | |
| 5060 | 2008-10-28 | 2008-11-28 | |
| 5020 | 2008-08-22 | 2008-10-24 | |
| 5000 | 2008-08-15 | 2008-08-22 | |
| 3090 | 2008-06-13 | 2008-08-22 | |
| 5060 | 2007-10-29 | 2007-11-29 | |
| 5020 | 2007-06-01 | 2007-10-26 | |
| 1090 | 2007-05-25 | 2007-06-25 |
Implementation Dates
| date of Ratification (DOR) (1) | 2010-06-01 |
|---|---|
| date of Availability (DAV) (2) | |
| date of Announcement (DOA) (3) | - |
| date of Publication (DOP) (4) | - |
| date of Withdrawal (DOW) (5) | - |
Relations
| Supersedes | |
|---|---|
| Superseded by | |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
