CENELEC

Project
| Reference | CLC/TR 50480:2011 |
|---|---|
| Title | Determination of cross-sectional area of conductors and selection of protective devices |
| Project Number | 16992 |
| Abstract/Scope | This Technical Report applies to low-voltage installations with a nominal system frequency of 50 Hz in which the circuits consist of insulated conductors, cables or busbar trunking systems. It defines the different parameters used for the calculation of the characteristics of electrical wiring systems in order to comply with rules of HD 384/HD 60364. These rules are mainly the following: - current-carrying capacities of the conductors; - characteristics of protective devices in regard to protection against overcurrent; - verification of thermal stress in conductors due to short-circuit current or earth fault current; - fault protection (protection against indirect contact) in TN systems and IT systems; - limitation of voltage drop; - verification of mechanical stresses during short-circuit in busbar trunking systems (BTS) according to EN 60439-2 or powertrack systems according to EN 61534 series. The calculations provided in this Technical Report are only applicable where the characteristics of the circuits are known. For the purpose of this document, when referring to Busbar Trunking Systems, Powertrack Systems are also considered. NOTE 1 Mechanical stress during short-circuit is covered by IEC 60865. NOTE 2 In general these calculations concern supply by HV/LV transformer, but they are also applicable to supply by LV/LV transformer and LV back-up generators. NOTE 3 Effects of harmonics currents are not covered by this document. This Technical Report is also applicable for checking the compliance of the results of calculations performed by software programs for calculation of cross-sectional area of insulated conductors, cross-sectional area of cables and characteristics for selection of busbar trunking systems with HD 384/HD 60364. |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2011-02-18 |
| Current Stage code deadline | |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 64 |
|---|---|
| Reference Document | |
| ICS | 29.060.01 - Electrical wires and cables in general 29.140.50 - Lighting installation systems |
| Keywords | Conductor; Cross-sectional area; Protective device |
| Note | Supersedes R064-003:1998 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
|
Stage
|
Date
|
Deadline Date
|
Documents
|
|---|---|---|---|
| 6060 | 2011-02-18 | ||
| 5099 | 2011-01-02 | 2011-01-30 | |
| 5060 | 2010-11-22 | 2010-12-03 | |
| 5020 | 2010-08-20 | 2010-11-19 | |
| 3090 | 2010-04-19 | ||
| 5062 | 2009-03-31 | 2009-04-22 | |
| 5060 | 2008-12-10 | 2009-01-09 | |
| 5020 | 2008-09-05 | 2008-12-05 | |
| 3090 | 2007-11-30 | 2008-09-25 | |
| 5092 | 2007-03-21 | 2007-09-21 | |
| 5020 | 2007-03-21 | 2007-03-21 | |
| 4060 | 2007-01-15 | 2007-03-20 | |
| 4020 | 2006-10-13 | 2007-01-12 | |
| 3099 | 2006-09-18 | 2006-10-18 | |
| 2020 | 2006-03-15 | 2006-09-15 | |
| 1090 | 2005-06-01 | 2005-12-01 |
Implementation Dates
| date of Ratification (DOR) (1) | 2011-01-02 |
|---|---|
| date of Availability (DAV) (2) | 2011-02-18 |
| date of Announcement (DOA) (3) | - |
| date of Publication (DOP) (4) | - |
| date of Withdrawal (DOW) (5) | - |
Relations
| Supersedes | R064-003:1998 |
|---|---|
| Superseded by | |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
