CENELEC

Project
| Reference | EN 61000-4-5:1995 |
|---|---|
| Title | Electromagnetic compatibility (EMC) - Part 4-5: Testing and measurement techniques - Surge immunity test |
| Project Number | 5979 |
| Abstract/Scope | Relates to the immunity requirements, test methods, and range of recommended test levels for equipment to unidirectional surges caused by overvoltages from switching and lightning transients. Several test levels are defined which relate to different environment and installation conditions. These requirements are developed for and are applicable to electrical and electronic equipment. Establishes a common reference for evaluating the performance of equipment when subjected to high-energy disturbances on the power and inter-connection lines. |
| Status |
Withdrawn
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 1995-03-22 |
| Current Stage code deadline | 1996-03-01 |
| Deadline date for vote |
Legal
| Directive(s) | EMC related (2004/108/EC) |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/SC 77B |
|---|---|
| Reference Document | IEC 61000-4-5:1995 (EQV) |
| ICS | 29.020 - Electrical engineering in general |
| Keywords | Electromagnetic compatibility; Immunity test; Surge |
| Note | Superseded by EN 61000-4-5:2006 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 1995-03-06 |
|---|---|
| date of Availability (DAV) (2) | 1995-03-22 |
| date of Announcement (DOA) (3) | 1995-06-01 |
| date of Publication (DOP) (4) | 1996-03-01 |
| date of Withdrawal (DOW) (5) | 1996-03-01 |
Relations
| Supersedes | |
|---|---|
| Superseded by | EN 61000-4-5:2006 |
| Normative reference (6) |
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
