International Standards and Conformity Assessment for all electrical, electronic and related technologies

CLC/SR 86C

Fibre optic systems and active devices

 

Project

Reference EN 61280-2-1:1999
Title Fibre optic communication subsystem basic test procedures - Part 2-1: Test procedures for digital systems - Receiver sensitivity and overload measurement
Project Number 12377
Abstract/Scope Specifies a test procedure applicable to digital fibre optic communication systems. Measures the minimum and maximum optical powers required and allowed at the input of a single-mode fibre optic system receiver connector to operate at specified BERs. Also verifies that the guaranteed error performance is obtained at the minimum and the maximum optical input powers specified by the terminal equipment manufacturer.
Status
Withdrawn

Status

Current Stage code 6060
Current Stage code date 1999-04-01
Current Stage code deadline 2000-01-01
Deadline date for vote  

Legal

Directive(s)  
Mandate(s)  
Order Voucher  

Details

IEC Technical Body IEC/SC 86C
Reference Document IEC 61280-2-1:1999 (EQV)
ICS 33.180.01 - Fibre optic systems in general
Keywords Fibre optic; Test procedure; Digital system; Receiver sensitivity; Overload measurement
Note EN following parallel vote * Superseded by EN 61280-2-1:2010
A-Deviation(s)  
Special National Condition(s)  

Environment

Clause
Categories - Aspects
Product Life Cycle
Information

History

Stage
Date
Deadline Date
Documents
6060 1999-04-01 2000-01-01 export to doc file  EN
5099 1999-04-01 1999-05-01  
5062 1999-01-12 1999-04-01  
5020 1998-09-04 1998-11-16  
1090 1998-08-31 1998-09-04  

Implementation Dates

date of Ratification (DOR) (1) 1999-04-01
date of Availability (DAV) (2) 1999-04-01
date of Announcement (DOA) (3) 1999-07-01
date of Publication (DOP) (4) 2000-01-01
date of Withdrawal (DOW) (5) 2002-01-01

Relations

Supersedes  
Superseded by EN 61280-2-1:2010
Normative reference (6)  

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.