International Standards and Conformity Assessment for all electrical, electronic and related technologies

 

Projekt

Reference prEN 50617-1:201X
Title Bahnanwendungen - Basic Parameters der Gleisfreimeldesystemen - Teil 1: Gleisstromkreisen
Project Number 23572
Abstract/Scope  
Status
Committee stage

Status

Current Stage code 3099
Current Stage code date 2013-04-17
Current Stage code deadline  
Deadline date for vote  

Legal

Directive(s)  
Mandate(s)  
Order Voucher  

Details

IEC Technical Body  
Reference Document  
ICS  
Keywords  
Note 2013-04-17 - Enquiry editing allocated to aclausse@cencenelec.eu * D139/C081: NWI approved * Resolution 36/3 following the report from WGA4-2 Survey Group on Train Detection Systems * 2 part standard * 2012-08-16: 9-month tolerance requested
A-Deviation(s)  
Special National Condition(s)  

Umwelt

Abschnitt
Kategorie(n) – Aspekt(e)
Produkt-Lebenszyklus
Information

Geschichte

stage
Datum
Deadline Date
Documents
3099 2013-04-17    
3020 2012-08-05 2012-10-05  
1099 2011-07-01    
1000 2011-05-10 2011-06-30  

Übernahmedaten

date of Ratification (DOR) (1)  
date of Availability (DAV) (2)  
date of Announcement (DOA) (3) -
date of Publication (DOP) (4) -
date of Withdrawal (DOW) (5) -

Beziehungen

Supersedes  
Superseded by  
Normative reference (6)  

(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved


(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat


(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level


(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement


(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn


(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.