CENELEC

Project
| Reference | EN 60763-1:2011 |
|---|---|
| Title | Laminated pressboard for electrical purposes - Part 1: Definitions, classification and general requirements |
| Project Number | 22651 |
| Abstract/Scope | IEC 60763-1:2010 contains the definitions required for the understanding of all three parts of IEC 60763, the classification of material into types, and the general requirements applicable to all material covered by the standard. The main changes with respect to the previous edition is that the specification was brought in line with the second edition of IEC 60641-1(2007). |
| Status |
Published
|
Status
| Current Stage code | 6060 |
|---|---|
| Current Stage code date | 2011-02-04 |
| Current Stage code deadline | |
| Deadline date for vote |
Legal
| Directive(s) | |
|---|---|
| Mandate(s) | |
| Order Voucher |
Details
| IEC Technical Body | IEC/TC 15 |
|---|---|
| Reference Document | IEC 60763-1:2010 (EQV) |
| ICS | 29.035.10 - Paper and board insulating materials |
| Keywords | Pressboard; Laminated |
| Note | Supersedes EN 60763-1:1996 |
| A-Deviation(s) | |
| Special National Condition(s) |
Environment
|
Clause
|
Categories - Aspects
|
Product Life Cycle
|
Information
|
|---|
History
Implementation Dates
| date of Ratification (DOR) (1) | 2011-01-02 |
|---|---|
| date of Availability (DAV) (2) | 2011-02-04 |
| date of Announcement (DOA) (3) | 2011-04-02 |
| date of Publication (DOP) (4) | 2011-10-02 |
| date of Withdrawal (DOW) (5) | 2014-01-02 |
Relations
| Supersedes | EN 60763-1:1996 |
|---|---|
| Superseded by | |
| Normative reference (6) |
EN 60641-1
|
(1) Date of ratification (dor) date when the Technical Board notes the approval of an EN (and HD for CENELEC), from which time the standard may be said to be approved
(2) Date of availability (dav) date when the definitive text in the official language versions of an approved CEN/CENELEC publication is distributed by the Central Secretariat
(3) Date of announcement (doa) latest date by which the existence of an EN (and HD for CENELEC), a TS or a CWA has to be announced at national level
(4) Date of publication (dop) latest date by which an EN has to be implemented at national level by publication of an identical national standard or by endorsement
(5) Date of withdrawal (dow) latest date by which national standards conflicting with an EN (and HD for CENELEC) have to be withdrawn
(6) This list of normative references is purely indicative. The only official list of normative reference is the list of the published standard.
